57
14.2 CU-2E12SBE, CU-2E15SBE & CU-2E18SBE
14.2.1 Pump down operation
Operate the pump down process according to the following procedure
o
Confirm the valve on the liquid side and gas side are open.
o
Short the CN-PUMP button on the Service PCB inside the outdoor unit for more than 5 seconds. Pump down
(cooling) operation is performed for 15 minutes.
o
Set the liquid side 3 way valve to close position and wait until the pressure gauge indicates 0.01MPa
(0.1kg/cm
2
G).
o
Immediate set the gas side valve to close position and then Short the CN-PUMP button to stop the pump
down operation.
NOTE: Pump down operation will stop automatically after 15 minutes if CN-PUMP button is not shorted again. Pump
down operation is not started within 3 minutes after compressor is stopped.
14.2.2 Heating only function
The equipment can be set to heating only operation by some setting on the Outdoor unit main circuit board
Switch off power supply to the outdoor unit, unplug and remove the lead wire on CN-HEAT.
close
Hexagonal
wrench
Liquid shut-off valve
Gas shut-off valve
Valve lid
Remove the lead wire
CN-HEAT
(HEAT ONLY)
CN-HEAT
(HEAT ONLY)
Содержание CU-2E18SBE
Страница 35: ...8 8 4 CPU U Printed d Circuit Board 35...
Страница 61: ...61...
Страница 62: ...62...