36
9. Installation Information
9.1 CU-2E12SBE CU-2E15SBE
9.1.1 Check
Points
9.1.2
The Shapes of the 3-Way Valve Caps of the Outdoor Unit Have Been Changed
Accompanying the changes in the shapes of the 3-way valve caps, the tightening method has also been changed.
Firmly tighten the 3-way valve caps by hand, and then tighten them up by another 30 degrees or so (one-twelfth
of a full turn) using a spanner or adjustable spanner.
Panasonic
Panasonic
elevation:
10m max
.
elevation between
each of the indoor
units and between
the indoor and
outdoor units.
1.5mm
2
flexible cord x 4 core
(polychloroprene sheathed)
(Not included in the unit)
Outdoor unit power supply:
Single-phase 230V, 50Hz
20A switch
(circuit breaker)
(Not included in the unit)
1.5 mm
2
or more x 3 core
(Not included in the unit)
Drain work
Drain elbow
(Inner diameter: 16mm) provided
Outdoor wiring work
Unit B
Unit A
Applicable connecting tube kit:
CZ-3F type
Total maximum pipe length: 30 m
Air purging: Air purging by vacuum pump.
Unit A Maximum pipe length: 20 m
Unit B Maximum pipe length: 20 m
connection cables
(Not included in the unit)
Grounding work
Caution:
Do not use all your strength to tighten up
the caps. Doing so may break the caps.
After having firmly tightened the caps by hand,
tighten them up further using a
spanner or adjustable spanner.
Содержание CU-2E18SBE
Страница 35: ...8 8 4 CPU U Printed d Circuit Board 35...
Страница 61: ...61...
Страница 62: ...62...