![Panasonic CS-A12KKD-2 Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/panasonic/cs-a12kkd-2/cs-a12kkd-2_service-manual_256573049.webp)
49
12. Operation
Control
12.1 Heating Operation
•
Heating operation can be set using remote control.
•
This operation is applied to warm the room temperature reaches the setting temperature set on the remote
control.
•
The remote control setting temperature, which takes the reading of intake air temperature sensor, can be
adjusted from 16°C to 30°C.
•
During heating operation, the compressor will stop running and restart as shown in below figure.
(A9/12KK)
(A18/24/28KK)
12.1.1 Heating Operation Time Diagram (For CS-A9KKD-2 CU-A9KKD-2 and CS-A12KKD-2
CU-A12KKD-2)
Содержание CS-A12KKD-2
Страница 3: ...3 18 Exploded View and Replacement Parts List 125 18 1 Indoor Unit 125 18 2 Outdoor Unit 131 ...
Страница 16: ...16 4 Location of Controls and Components 4 1 Indoor Unit 4 2 Outdoor Unit 4 3 Remote Control ...
Страница 17: ...17 5 Dimensions 5 1 Indoor Unit 5 1 1 CS A9KKD 2 CS A12KKD 2 ...
Страница 18: ...18 5 1 2 CS A18KKD 2 CS A24KKD 2 CS A28KKD 2 ...
Страница 19: ...19 5 2 Outdoor Unit 5 2 1 CU A9KKD 2 5 2 2 CU A12KKD 2 ...
Страница 20: ...20 5 2 3 CU A18KKD 2 CU A24KKD 2 CU A28KKD 2 ...
Страница 21: ...21 6 Refrigeration Cycle Diagram 6 1 CS A9KKD 2 CU A9KKD 2 CS A12KKD 2 CU A12KKD 2 ...
Страница 22: ...22 6 2 CS A18KKD 2 CU A18KKD 2 CS A24KKD 2 CU A24KKD 2 CS A28KKD 2 CU A28KKD 2 ...
Страница 23: ...23 7 Block Diagram 7 1 CS A9KKD 2 CU A9KKD 2 ...
Страница 24: ...24 7 2 CS A12KKD 2 CU A12KKD 2 ...
Страница 25: ...25 7 3 CS A18KKD 2 CU A18KKD 2 CS A24KKD 2 CU A24KKD 2 ...
Страница 26: ...26 7 4 CS A28KKD 2 CU A28KKD 2 ...
Страница 31: ...31 9 Electronic Circuit Diagram 9 1 CS A9KKD 2 CU A9KKD 2 ...
Страница 32: ...32 9 2 CS A12KKD 2 CU A12KKD 2 ...
Страница 33: ...33 9 3 CS A18KKD 2 CU A18KKD 2 CS A24KKD 2 CU A24KKD 2 ...
Страница 34: ...34 9 4 CS A28KKD 2 CU A28KKD 2 ...
Страница 36: ...36 10 1 1 2 CS A28KKD 2 ...
Страница 39: ...39 10 1 7 Eco Patrol Printed Circuit Board ...
Страница 54: ...54 12 3 2 Soft Dry Operation Time Diagram For CS A18KKD 2 CU A18KKD 2 and CS A24KKD 2 CU A24KKD 2 ...
Страница 86: ...86 Normal Deice Time Diagram Overload Deice Time Diagram ...
Страница 91: ...91 a Normal Deice Time Diagram b Overload Deice Time Diagram ...
Страница 97: ...97 Figure 3 Figure 4 Figure 5 16 1 1 3 To remove discharge grille Figure 6 ...
Страница 99: ...99 Figure 10 Figure 11 ...
Страница 101: ...101 16 2 1 3 To remove power electronic controller Figure 14 Figure 15 Figure 16 Figure 17 ...
Страница 103: ...103 Figure 21 Figure 22 Figure 23 ...
Страница 104: ...104 17 Technical Data 17 1 Thermostat Characteristics ...