7-36
■
Preparation of Sub PCB
■
Assembly of RF-IF PCB and BT PCB
0~1mm
PR PCB Ass'y
DU CNT Angle
PR PCB
Screw(N3)
Ԙ
EXT ANT PCB
PORTRE Sheet Avoid running over the end
of the PCB by 0.5 mm or
more.
Back side
IO PCB
FFC(IO)
IO PCB Ass'y
BAT CON Angle Ass'y
BAT CON Angle
BAT Cushion
RF-IF PCB Ass'y
RF-IF PCB
Screw(N3)
ԙ
FPC(HSDPA)
Screw(N3)
ԛ
Fit into the Plate
Fit into the Plate
before attaching
before attaching
the PCB.
the PCB.
Fit into the Plate
before attaching
the PCB.
Lock the Connector
Lock the Connector
after inserting it.
after inserting it.
Lock the Connector
after inserting it.
Lock the Connector
after inserting it.
Screw(N3)
Ԛ
SD-LAN
PCB
Ass'y
Lock the Connector
Lock the Connector
after inserting it.
after inserting it.
Lock the Connector
after inserting it.
Screw(N5)
Apply the lubricant (sub material)
on the Battery Connector for about
1 second.
(Be careful about
spraying around when applying.)
BAT Insulation Sheet
BAT Insulation Sheet
BAT Insulation Sheet
Attach to the
Attach to the
Connector before
Connector before
Ass'y.
Ass'y.
Attach to the
Connector before
Ass'y.
Attach matching
to the upper shape
of the Connector.
Glue part
Glue part
Glue part
FPC(Battery)
BAT CON Holder
ANT Cable Holder
ANT Cable Holder
ANT Cable Holder
LAN Cable
Insert
Addition
FPC(SD LAN)
SD-LAN PCB
Back
side
SD PWD
SD PWD
INS Sheet
INS Sheet
SD PWD
INS Sheet
0±0.5mm
0~0.5mm
0~2mm
0~1mm
0.5~1.5mm
0±0.5mm
0~1mm
0~1mm
0~1mm
*Notice
·Arrow part without specified measurement: 0~0.5 mm
<Screw tightening torque>
Screw(N3, N5) = 0.2 ± 0.02N·m (
ѳ
2.0 ± 0.2kgf·cm)
*Use an electric driver with low impact for Screw(N5).
<Screw tightening order> Screw(N3) =
Ԙ
→
ԙ
→
Ԛ
→
ԛ
Gasket
<Screw tightening torque>
Screw(N19) = 0.2 ± 0.02N·m (
ѳ
2.0 ± 0.2kgf·cm)
<Screw tightening order>
Screw(N19) =
Ԙ
→
ԙ
→
Ԛ
→
ԛ
→
Ԝ
→
ԝ
Screw(N19)
Ԙ
Screw(N19)
ԙ
Screw(N19)
Ԛ
Screw(N19)
ԛ
Screw(N19)
Ԝ
Screw(N19)
ԝ
Insert
RF-BT Plate
FFC(BT)
BT PCB
Insert into the hole
of PCB as below.
Clamper
Clamper
Clamper
RF-IF PCB Ass'y