KW1M Eco
-
POWER METER
25
6.2 AKW1110
Be sure to wire correctly according to the terminal arrangement
and wiring diagrams.
After completing wiring, be sure to attach the terminal cover for
safety reasons.
6.2.1 Terminal arrangement
No. Function
①
L
②
N
Power supply
③
N.C.
④
P1
⑤
P0
⑥
P2
Measured voltage
input
⑦
*1
N.C.
⑧
+
⑨
-
⑩
E
RS485
⑪
+
⑫
-
Pulse output
⑬
*1
⑭
*1
N.C.
*1)
⑦
,
⑬
and
⑭
terminals are connected internal to analog input terminal.
The input voltage to each terminal is as follows.
Terminal Phase
and
wire
Terminal Input
voltage
Operating
power supply
1P2W
①-②
100-240VAC (100 – 240V
~
)
(Line voltage)
1P2W
④-⑤
0-220VAC ( 0-220V
~
)
(Line voltage)
1P3W
④-⑤-⑥
0-110VAC (0-110V
~:
3W)
(Phase voltage)
Measured
voltage input
3P3W
④-⑤-⑥
0-220VAC ( 0-220V 3
~
)
(Line voltage)
6.2.2 Wiring Diagrams
・
Please connect a breaker to the voltage input part for safety reasons and to protect the device.
・
Grounding the secondary side of VT(Voltage transformer) and CT(Current transformer) is not
necessary with low-voltage circuit.
◆
When measuring a load with rated input voltage (100-200V system)
Single-phase two-wire system
*
One current transformer (CT) is required.
Содержание AKW1110
Страница 1: ......
Страница 54: ...KW1M Eco POWER METER 46 Chapter 9 Mounting 9 1 Dimensions 9 1 1 AKW1111 Main unit 9 1 2 AKW1110 Main unit ...
Страница 55: ...KW1M Eco POWER METER 47 Panel cutout 9 1 3 Dedicated CT unit mm For 5A 50A AKW4801C tolerance 1 0 ...
Страница 56: ...KW1M Eco POWER METER 48 For 100A AKW4802C For 250A AKW4803C ...
Страница 60: ......