3-15
1-19. S1 Post Loading Arm Unit
Replacement & Adjustment
(Removal)
1. Remove the S5 Post Base Unit. (Refer to item 1-
17)
2. Remove the Tension Arm Unit. (Refer to item 1-
18).
3. Unscrew the screw (A) and remove the S1 Post
from Loading Rail as shown in Figure 1-19.
4. Remove the Cut Washer (B) and remove the S1
Loading Arm Unit as shown in Figure 1-19.
(Installation)
1. Install the new S1 Loading Arm Unit follow the
removal steps in reverse order, and then S1 Post
Loading Arm Unit Phase Adjustment should be
performed as follows.
2. After installation, confirm that the S1 Post
moving smoothly on the Loading Rail.
3. Tension Arm and Tape pass Adjustment should
be performed.
(Adjustment)
Install and adjust so that the Hole (A) is to be parallel
with Hole (B) as shown in Figure 1-19.
Figure 1-19
Содержание AJ-D400
Страница 17: ...2 1 1 Name of Tape Transportation ...
Страница 103: ...3 27 2 3 SERVO P C Board Type C D Model ...
Страница 104: ...Printed in Japan F20009912NMH ...