5.0 Installing cable glands (cont.)
11. Slide the
Rubber Boot
down the cable and over the
Cable Gland Assembly
(see
Figure 14
below).
Figure 14: Sliding the rubber boot over the cable gland assembly
12. Make sure the
Rubber Boot
completely covers the
Cable Gland
and that no tears have occurred in the boot during the
assembly process (see
Figure 15
below).
Figure 15: The Completed Cable Gland Assembly
10
Содержание PanaFlow LZ
Страница 1: ...PanaFlow LZ User s manual 910 316 Rev A September 2017 ...
Страница 2: ... no content intended for this page ii ...
Страница 19: ...15 ...