5.0 Installing cable glands (cont.)
5. Push the
Coaxial Cable
into the gland until the
Armor Clamp
is fully inserted into the
Threaded Entry
section. (see
Figure 8
below).
Figure 8: Inserting the armor clamp into the gland
6. Screw the
Middle Nut
onto the cable gland to secure the clamped section (see
Figure 9
below).
Figure 9: Installing the middle nut
7
Содержание PanaFlow LZ
Страница 1: ...PanaFlow LZ User s manual 910 316 Rev A September 2017 ...
Страница 2: ... no content intended for this page ii ...
Страница 19: ...15 ...