background image

Installation manual 

 

 
 

 

Door and window 

  If  it  is  a  double door, the 

doorframe is supplied in 
separate parts due to 
transportation requirements and 
you will have to begin by 
assembling it.  

Doorframe: 

  To do this, place together the 4 

parts of the frame and screw 
them onto one another.  

  Make sure that the part of the 

frame with the deeper notch is 
installed upwards. The lateral 
jamb parts have hinges and are 
mirrored.  

  It is recommended to install the 

leaves later.  

  If it is a single door, its frame and 

leaf are supplied already 
assembled. 

 Doorframe installation (Only necessary for a double door!): 

 

 

The doorframe is placed at the 
formed aperture and pushed with 
force onto the lower log. If it is a 
double door, place the leaves on the 
hinges now. To open and close the 
door, fit the separately packaged lock 
and handle.  

Door installation: 

 

 

 

Continue with the installation of the wall logs  until you reach the window height. The wall plans (see 
Technical specifications) show how many logs go under the window. Install the window similarly with 
the door. Just like the door, push the window frame with the window into the window aperture onto the 
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).  

Window installation: 

ADVICE

: Definitely make sure that the windows and doors open in the proper direction. The doors 

always open from the inside 

to the outside

. The revolving-tilting windows open 

to the inside

. The 

revolving and the slinging windows open 

to the outside

 (the window handles are on the inside). 

ATTENTION

: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it 

will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, 
the wall logs will begin subsiding.  

You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house 
installation, when the house will have become adapted to weather conditions and its logs settled.  

www.simplylogcabins.co.uk

Содержание Whitewood Malta 2

Страница 1: ...nt exclues de tout change Toutes les revendications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis...

Страница 2: ...___________________________________________ P dansk Kontrol Certifikat Opbevares sikkert Dansk Det k bte hus er fremstillet i overensstemmelse med de h je kvalitets krav Produktet er blevet omhyggelig...

Страница 3: ...nes t cnicas Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Log cabin FRB28 3227 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin ZL...

Страница 4: ...y review complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already painted processed with a...

Страница 5: ...pregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather...

Страница 6: ...sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cas...

Страница 7: ...ways assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Te...

Страница 8: ...eight The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the wi...

Страница 9: ...dewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder...

Страница 10: ...ons do not include it in the kit Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smudging on the floor Place the floor boards on the base frame...

Страница 11: ...ts so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell...

Страница 12: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 13: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 14: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 15: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 16: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 17: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 18: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 19: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 20: ...w w w s i m p l y l o g c a b i n s c o u k...

Отзывы: