
Ancillary equipment
Assembling the pulley head:
•
Extend the extension booms until approx. 50 cm (2 ft) before the pulley head.
1.
Insert connecting block into extension boom and secure with pin.
2.
Secure pin with spring cotter.
3.
Lower extension boom until lifting gear fits onto pulley head, and secure with pin.
4.
Secure pin with a linch pin.
5.
Rotate the pulley head upwards, until it can be secured with the connecting block.
6.
Secure pin with a linch pin.
•
Reel off sufficient rope.
•
Switch off crane.
•
Reeve the rope.
•
Assemble the lower load block.
•
Check rope guidance and rope.
•
While operating the winch the rope must run over all of the pulleys (additional rollers etc.).
Danger!
If the rope is not properly reeved, this may lead to
damages. There is risk of injury or even fatal injury.
Example:
•
Move the load arm to a working position.
Warning!
When mounting or dismounting the crane and while
moving it in transport or working position there is serious risk of
getting crushed!
52
Содержание PC 3800
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 26: ......
Страница 30: ......
Страница 44: ......
Страница 46: ......
Страница 54: ......
Страница 70: ......
Страница 72: ......
Страница 86: ......
Страница 96: ......
Страница 98: ......
Страница 106: ......
Страница 122: ......
Страница 124: ......
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 137: ...Chapter 13 C H A P T E R 1 3 Technical description 131 ...
Страница 138: ...132 132 ...
Страница 157: ... ...
Страница 158: ......