7
Electrical Installation
Revision 1.3
- 25 -
7.6
Main power supply wiring
G
ro
u
n
d
C
a
b
le
Ground
(Third Battery Shown
for heavy applications Only)
+
-
Liftgate Mount Frame
Main Truck
Batteries
2
G
a
.
L
ift
g
a
te
P
o
w
e
r
C
a
b
le
Ground
+
-
+
-
To Ignition
Switch
Ground
Aux. Batteries
(if applicable)
Battery
Isolator
+
-
(if applicable)
Circuit
Breaker
+
-
Circuit
Breaker
Figure 26 Main wiring with optional aux battery setup