ILP 25/33 Installation Manual
Rev. 1.4
- 51 -
Stake Bed Vehicles
1. Mount Switch: Mount toggle switch to dock bumper strut using two #10x1-
1/2” self-tapping screws.
Dock Bumper
Bed
Ex
ten
sion
Sill
Dock
Bumper
Strut
2. Route Wire: Route the toggle switch harness along the vehicle body down to the pump and motor.
To prevent damage to the harness, properly secure the harness and keep cleared from any moving
liftgate parts.
3. Connect wires: Reference Sections
13.9-13.10 for wiring according to your liftgates specifications.
4. Check Switch Operation: Verify that the up and down functions on the toggle switch operate as
intended.
5. Seal Connetions: Heat shrink and seal all connections, if applicable.