![Palfinger ILK 22 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/palfinger/ilk-22/ilk-22_installation-manual-and-check-off-sheet_747920034.webp)
ILK
22/33/44/55/66
I
NSTALLATION
M
ANUAL
Revision 1.6
- 34 -
6.2
On-off Switch Trailer application
On a trailer installation the control port J11 has to be connected with a on off toggle switch connecting 2 and
4 on port J11 together.
Unplug exsiting J11 connector from board
Install 2 Position Toggle Switch in Control Box Face
Run leads from Toggle Switch to #2 & #4 on Circuit Board
Use Tie Straps to hold unused J11 Connector in safe location
On-Off-Switch
For questions regarding operation call (888) 774-5844
ILK
• To operate this liftgate read and understand the
operating decals and manuals.
• Make certain the platform is clear before
operating the lift.
• Liftgate shut-off switch must be turned off when
liftgate is not in use.
• Keep platform in horizontal position when loading
and unloading.
• Always raise the platform to floor level in
horizontal position before closing.
• Do not overload, refer to capacity decals.
Tilt
Lift
Max Capacity
on Platform
Platform
24"
Up
Down
Up
Down
Load
OPERATING INSTRUCTIONS
The Circuit Board is located behind the rubber cover on the curb side of the
7” x 7” mount tube.
Use a 2-wire harness to install the on-off switch at control box.
When harness and switch are installed, always replace the plastic clamp back on the rubber cover.
Inspect and test all electrical connections, wiring and the different functions to make sure
that the electrical installation is complete.