
2015
OPERATIONS
MANUAL
67
MACHINE INSTALLATION
MACHINE PLACEMENT
THE PACMAC MUST BE SET CENTERED UNDERNEITH THE FILLER (I.E.
SCALE/CONVEYOR) SO THAT THE PRODUCT DROPPING OUT
FALLS DOWN THE CENTER OF THE FORMING TUBE ASSEMBLY.
ALLOW ADEQUATE SPACE AROUND THE MACHINE SO THAT THE
DOORS CAN BE OPENED FULLY AND THE FILM AND ZIPPER CAN
BE LOADED.
VOLTAGE REQUIREMENTS
208-240 VAC
50AMP
AIR REQUIREMENT
100-120 PSI
50CFM
MINIMUM PIPE SIZE 3/4” ISD (INSIDE DIAMETER) PIPE.
Содержание 2015
Страница 1: ...Pacmac Model 2015 OPERATIONS MANUAL v1 7...
Страница 15: ...2015 OPERATIONS MANUAL 14 JAMMED JAW o SETS THE LENGTH OF TIME ALLOWED FOR THE JAWS TO BECOME FULLY CLOSED...
Страница 60: ...2015 OPERATIONS MANUAL 59 FILM THREAD DIAGRAM THREAD THE FILM ALL THE WAY THROUGH TO THE PULL BELTS...
Страница 63: ...2015 OPERATIONS MANUAL 62 THREAD THE ZIPPER...
Страница 70: ...2015 OPERATIONS MANUAL 69 INTERFACE WIRING...
Страница 72: ...2015 OPERATIONS MANUAL 71...
Страница 73: ...2015 OPERATIONS MANUAL 72...