
2015
OPERATIONS
MANUAL
35
ZIPPER WHEELS
TIMED TO OPEN AT THE END OF THE FILM DRIVE.
USED TO DRIVE ZIPPER AND RELEASE TENSION ON THE BAG.
BEFORE SEALING TO PREVENT WRINKLES.
FILM DRIVE END DEGREE ROUNDED UP TO THE NEAREST 5 OR 0 =
ZIPPER WHEEL START TIME.
ZIPPER WHEEL START TIME + 10 = STOP TIME.
TYPICAL TIMING.____________________________________140-150
ULTRASONICS
TIMED TO PINCH THE FILM AFTER THE ZIPPER WHEELS RELEASE
TENSION.
USED TO FLATTEN THE ENDS OF THE ZIPPER FOR BETTER SEALS.
CONSIST OF ZIPPER PINCH TIMING AND ZIPPER WELD TIMING.
ZIPPER WHEEL END TIME = ZIPPER PINCH START TIME.
PINCH TO 350 ALWAYS.
ZIPPER PINCH START TIME = ZIPPER WELD START TIME.
ZIPPER WELD START TIME PLUS 100 + ZIPPER WELD END TIME.
GAP SHOULD BE SET TO .001, REFER TO THE PACMAC VFFS START
UP PROCEDURE FOR MORE INFORMATION ON SETUP.
TYPICAL TIMING ZIPPER PINCH.______________________ 150-350
TYPICAL TIMING ZIPPER WELD._______________________ 150-250
GUSSET
TIMED TO EXTEND OUT AFTER THE FILM DRIVE BUT BEFORE THE
JAW CLOSES.
USED TO TUCK THE BOTTOM OF THE BAG TO CREATE A FLAT
BOTTOM.
FILM DRIVE END – 40 = GUSSET START TIME.
RETRACT GUSSET AT 250 ALWAYS.
SHOULD TUCK 1.5”. REFER TO THE PACMAC VFFS START UP
PROCEDURE FOR MORE INFORMATION ON SETUP.
TYPICAL TIMING.____________________________________100-250
Содержание 2015
Страница 1: ...Pacmac Model 2015 OPERATIONS MANUAL v1 7...
Страница 15: ...2015 OPERATIONS MANUAL 14 JAMMED JAW o SETS THE LENGTH OF TIME ALLOWED FOR THE JAWS TO BECOME FULLY CLOSED...
Страница 60: ...2015 OPERATIONS MANUAL 59 FILM THREAD DIAGRAM THREAD THE FILM ALL THE WAY THROUGH TO THE PULL BELTS...
Страница 63: ...2015 OPERATIONS MANUAL 62 THREAD THE ZIPPER...
Страница 70: ...2015 OPERATIONS MANUAL 69 INTERFACE WIRING...
Страница 72: ...2015 OPERATIONS MANUAL 71...
Страница 73: ...2015 OPERATIONS MANUAL 72...