
2015
OPERATIONS
MANUAL
51
SET THE VERTICAL
HEATER
WITH THE TUBE SLIDE ALL THE
WAY IN AND IN THE PROPER
POSITION, CLOSE THE
VERTICAL HEATER AND
SECURE LATCH.
LOOSEN THE HEATERS VIA THE
2 HANDLES ON EACH BAR.
o
HANDLE
SLIDE THE BARS IN UNTIL THEY
ARE AN 1/8” OF THE ZIPPER
GUIDE. PARALLEL WITH THE
TUBE FROM TOP TO BOTTOM.
o
ZIPPER GUIDE
o
1/8 GAP
OPEN THE VERTICAL HEATER
ASSEMBLY AND LINE THE
OTHER SIDE UP EVENLY AND
TIGHTEN DOWN.
THE BARS SHOULD HIT ON
CENTER LINE WITH THE ZIPPER
GUIDE FROM TOP TO BOTTOM.
Содержание 2015
Страница 1: ...Pacmac Model 2015 OPERATIONS MANUAL v1 7...
Страница 15: ...2015 OPERATIONS MANUAL 14 JAMMED JAW o SETS THE LENGTH OF TIME ALLOWED FOR THE JAWS TO BECOME FULLY CLOSED...
Страница 60: ...2015 OPERATIONS MANUAL 59 FILM THREAD DIAGRAM THREAD THE FILM ALL THE WAY THROUGH TO THE PULL BELTS...
Страница 63: ...2015 OPERATIONS MANUAL 62 THREAD THE ZIPPER...
Страница 70: ...2015 OPERATIONS MANUAL 69 INTERFACE WIRING...
Страница 72: ...2015 OPERATIONS MANUAL 71...
Страница 73: ...2015 OPERATIONS MANUAL 72...