Solana Leg Press Option Assembly Instructions
page 6
1
2
3
4
5
6
3
Assembly
Instructions
Assembly Instructions
Assembly of the Leg Press Option takes professional
installers about 1 hour to complete. If this is the first time
you have assembled this type of equipment, plan on
significantly more time.
Professional installers are highly recommended.
CAUTION: Obtain assistance! Do not attempt to
assemble the Leg Press Option by yourself.
Because of the weight and size of the equipment,
you could be injured or damage the equipment.
Review the
Installation Requirements on page 5
before proceeding.
Important:
For ease of assembly, the fasteners and
hardware for each step are labeled and packaged in
separate bags.
Assemble the components in the
sequence presented in this guide.
Leg Press Option