background image

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Figure 4.9 

 
 

4.7.3 LEVELING FUNCTION 

 

Leveling the machine: 

 

Ø

  Lateral brush pressure lever (figure 4.9). Screw and unscrew the knob to increase or decrease the 

pressure of the lateral brush. 

Ø

  Replaced lever for the main brush (figure 4.9). Pull out the lever and replace the wear main brush. 

The machine must be switched-off before performing adjustments.  

 
 

4.7.4  WASTE HOPPER 

 

Follow the instructions below in order to empty the waste hopper: 

 

Ø

  Unlock the retaining clamp (figure 4.10) 

Ø

  Empty the hopper (figure 4.10).in the appropriate refuse bin 

Ø

  Insert the hopper and lock it in position with the retaining clamp. 

 

Please ensure the machine is off before emptying the waste hopper. 

 
 
 
 
 
 
 
 
 
 

 

 1 

Figure 4.10 

20

 

Содержание SW26

Страница 1: ...it near the machine protected from liquids and other damaging substances Failure to follow the instructions may result in injury or damage to equipment and property The contents of this manual are bas...

Страница 2: ...sages 11 3 8 Dangers 13 3 9 Safety Signals 14 4 INSTRUCTIONS FOR STARTING AND USE 4 1 Transport and handling 16 4 2 Storage 17 4 3 Instructions for unpacking the machine 17 4 4 Handling an unpacked ma...

Страница 3: ...ed to avoid injury or damage This symbol is used to inform the operator on general information 1 2 NOTES 1 3 MANUAL REFERENCES This manual ensures easy and safe use of the machine as recommended by Eu...

Страница 4: ...e defective parts and does not include incidental or consequential damages arising from the use of a Pacific Floorcare machine whether defective or not This warranty is in lieu of all other expressed...

Страница 5: ...where it happened RMA clearly written applied to the outside of the shipping box In case of defective electronic goods please return them separately from other materials in order to help us properly...

Страница 6: ...2V and the traction system is accomplished by the brushes inertia The machine is supplied with two rotating brushes one lateral and one central The lateral moves the dust in to the center of the machi...

Страница 7: ...r reduction motor main brush lateral brush filter motor shaker vacuum motor fan operator control handle Each machine is inspected during the manufacturing process and the final quality check is done b...

Страница 8: ...ENTRAL BRUSH WIDTH 15 7 in 400 mm SIDE BRUSH MOTOR 24 v 220 RPM CENTRAL BRUSH MOTOR 12 V 2300 RPM VACUUM MOTOR 12 V SIDE BRUSH DIAMETER 11 8 in 300 mm WEIGHT INCLUDING BATTERY 105 8 lbs 48 kg Specific...

Страница 9: ...nd guards Charging the batteries in places without adequate ventilation No respect of safety rules from the operators Any modification not authorized by Pacific Floorcare Use of acid products that can...

Страница 10: ...tand information and procedures outlined within this manual Pacific Floorcare shall not be held liable for accidents involving persons or things from improper use of the machine or by unauthorized and...

Страница 11: ...system has stopped the motor to protect the drive due to an excessive peak of current To reset restart the machine 41 2 Motor I2 T The system has stopped the motor to protect it due to excessive cont...

Страница 12: ...rrect operation of the machine but serves only as a warning Vacuum STANDARD ERROR CODE DEFAULT FLASHES MEANING DESCRIPTION ACTION 1 1 Vacuum motor shutdown A current error occurred on the vacuum motor...

Страница 13: ...e When replacing the main and lateral brushes When cleaning the vacuum filter When adjusting the brush pressure All maintenance operations must be performed with the machine turned off Also there are...

Страница 14: ...IGNALS Safety signals include DANGERS Signals are triangular shaped with black colored in yellow field pictograms PROHIBITED Signals are circular shaped with black colored in white field red crossed p...

Страница 15: ...d covers What is it This signal shows crushing or pinch dangers due to moving parts of the machine What to do In phase of installation maintenance the machine must be turned off and the ignition key r...

Страница 16: ...hem Use caution when moving and avoid stacking If agreed upon to ship without packaging please secure machine with straps and blocking Do not transport in a manner where adverse weather or surrounding...

Страница 17: ...than 80 and storage temperature between 37 F to 113 F 3 C t 45 C 4 3 INSTRUCTIONS FOR UNPACKING THE MACHINE Carefully cut off the banding Take away on the base of the carton the clips that keep it se...

Страница 18: ...ing using the original packaging to transport 4 5 INSTALLATION The installation must be done by authorized personnel 4 5 CONTROL DEVICES 4 5 1 CONTROL PANEL The control panel controls the main functio...

Страница 19: ...eding with operation please ensure all guards and protections are installed and functioning properly 4 7 1 STARTING AND MACHINE PREPARATION The SW26 is equipped with a battery charger Only use the pro...

Страница 20: ...the lever and replace the wear main brush The machine must be switched off before performing adjustments 4 7 4 WASTE HOPPER Follow the instructions below in order to empty the waste hopper Unlock the...

Страница 21: ...eplace it with a new one Secure the lever and replace the bearing into the brush Let down the machine ready to work Figure 4 11 Replacing the lateral brush Turn off the machine Position the machine as...

Страница 22: ...y open the main cover figure 4 13 and insert the charger cable on the male socket figure 4 14 Then connect the charging cable to the power grid Figure 4 13 Charger cable Figure 4 14 Pay attention at t...

Страница 23: ...only For assistance and spare parts contact Pacific Floorcare OPERATION PROCEDURE FREQUENCY Cleaning Clean the recovery tank filter and suction motor filter Everyday Never use corrosive cleaning prod...

Страница 24: ...ttery Remove the rubber gasket figure 5 1 Remove filter and clean it with the compressed air figure 5 1 Check the vacuum motor figure 5 1 2 Figure 5 1 5 3 CHECKING THE ELECTRICAL SYSTEM The electrical...

Страница 25: ...5 2 MAINTENANCE LOG DATE NAME NOTES INITIALS 25...

Страница 26: ...of work warranty Machine working conditions Description of defect Name Type of defect q Detective mechanical component q Incorrect functioning Short description of defect q Electrical system failure q...

Страница 27: ...Date of installation Serial no...

Отзывы: