-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
▲
I
NSTRUCTION
M
ANUAL
TERAPRESS TP
-
7100S
Mounting Press
Please read this instruction manual carefully and follow all installation, operating and safety guidelines.
3601 E. 34th St. Tucson, AZ 85713 USA Tel. +1
-
520
-
882
-
6598 Fax +1
-
520
-
882
-
6599 email: [email protected] Web: https://www.metallographic.com
3.0 Unpacking, Shipping and Installation
3.1 Unpacking
Unit is delivered in a box. Unpack and check for completeness of
parts.
Measures WxHxD: 31 x 19 x 19
-
inches (534 x 485 x 485mm)
Weight: Approx. 68 lbs (31 kg)
3.2 Shipping
When moving box, lift from bottom.
The
TERAPRESS TP 7100S
compression mounting press is
constructed of sensitive electronic and mechanical components.
Do not drop.
!
Use caution when unloading to prevent injury
.
7
3.3 Installation
!
Install unit carefully! Improper installation voids warranty.
The
TERAPRESS TP 7100S compression mounting press
should be placed on a flat
stable surface. Connect to air supply, water supply, drain and electrical connections.
After water, air, drain and electrical connections are completed, the system is ready for
operation by activating the main power switch.
Installation continued on next page