3
FIG. 4E
First make sure your handle latches are in, this makes
the rail install much easier
(FIG 4F).
WARNING:
IF YOU DO NOT HAVE THE LATCHES
IN, THE HANDLE WILL CATCH THE RAIL AS YOU
ATTEMPT TO SLIDE IT IN.
Next line up the Rail sill vertical between the 3rd and
4th Rib of the Rail Guide Spacer
(FIG 4B).
Then hook
the Outside Groove of the rail into the Rail Guide and
rotate down until the rail and rail guide are level
(FIG
4C & 4D).
Now push the rail all the way forward
(FIG
4E).
Finally you can install the Rail Screw, Flat and
Lock Washer securing the rail to the canister
(FIG 4G).
FIG. 4C
FIG. 4D
FIG. 4B
3rd Rib
4th Rib
Rail Sill
Outside
Rail Guide
Rotate Down
while remaining in
Rail Guide
Rail
Remove the protective paper from the foam on the underside of the Rail flanges. This is for packaging purposes only.
Next identify the left and right side rails
(FIG 4A).
The rail flange and foam towards the outside of the truck bed.
WARNING
: IF YOU HAVE AN ‘02-’08 DODGE PICK-UP, PROCEED TO STEP 8 BEFORE CONTINUING.
STEP 4: INSTALLING RAILS
1/4” FLAT
WASHER x 2
HARDWARE
USED:
1/4-20 X 5/8”
RAIL SCREW
x 2
1/4” LOCK
WASHER x 2
Left Rail
Right Rail
Tailgate End
Cab End
FIG. 4A