![Paccar Carco H200 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/paccar/carco-h200/carco-h200_service-manual_745542027.webp)
27
WINCH DISASSEMBLY
26.
Support the horizontal fairlead roller assembly (Item 201) with a wide-band sling or other positive-retention method.
Remove the cap screws (207) and clip (205) that secure the roller assembly to the winch housing. Carefully remove
the roller shaft (202) from the housing. Remove the roller assembly (201) and spacer washers (206) from each end
of the roller assembly.
The cable drum is supported in the winch housing
by bearings on the output ring gear and the brake
housing. If either of these components is removed,
and the cable drum is not supported externally as de-
scribed in the text, the cable drum may come loose
in the housing. The cable drum weighs approximately
1,000 lbs. (454 kg). Damage to parts or personal in
-
jury can occur if precautions are not taken. Ensure
lifting equipment has adequate capacity.
CAUTION
!
!
The horizontal roller assembly weighs approximately
75 lbs. (34 kg). The vertical roller assembly weighs
approximately 100 lbs. (45 kg). Damage to parts
or personal injury can occur if precautions are not
taken. Make certain lifting equipment has adequate
capacity.
CAUTION
!
!