background image

PowerHalt is a registered trademark of Pacbrake Co.

12

PH2 - AUTO MANUAL / ELECTRIC WITH PULL CABLE(S)

L6372

TEST MODE

The test mode ensures that the system’s automatic function is working as intended. 

1.

  Hold the SET and TEST buttons simultaneously until both lights begin to fl ash (approximately 5 seconds), then 

release both buttons.

2.

  Press then release the TEST button on the controller, the green light will start fl ashing rapidly and the red light will 

turn off.

3.

  Raise the engine speed to HALF of the emergency engine shut-off speed.

4.

  The emergency shut-off valve will actuate to shut down the engine.

5.

  The green light will continue fl ashing and the red light will illuminate for 5 seconds before returning to Programmed 

State.

NOTE: If the valve activated but the engine failed to shut down, check for leaks in the piping and consult a 

PowerHalt representative.

ERASING THE EXISTING EMERGENCY ENGINE SHUTOFF SPEED

1.

  Hold both SET and TEST buttons simultaneously until both lights begin to fl ash  (approximately 5 seconds) before 

releasing.

2.

  Press and hold the SET button until the red and green lights begin fl ashing in an alternating order, indicating that 

memory has been cleared.

3.

  Repeat SETUP PROCEDURES to program a new emergency engine shut-off speed.

UNPROGRAMMED 

STATE

SETTING EMERGENCY 

ENGINE SHUT-OFF 

SPEED

ERASING SAVED

EMERGENCY ENGINE

SHUT-OFF SPEED

PROGRAMMED STATE

TEST MODE

SYSTEM FUNCTION FLOW CHART

EXAMPLE:

SETUP RPM

PRESS "SET" 

BUTTON

OVERSPEED MARGIN

EMERGENCY ENGINE SHUTOFF SPEED

(SETUP RPM) + (OVERSPEED MARGIN)

%

RPM

1800

1 time

10

1800 x 0.10 = 

180

1800 + 180 = 

1980

1800

2 times 

20

1800 x 0.20 = 

360

1800 + 360 = 

2160

1800

3 times

30

1800 x 0.30 = 

540

1800 + 540 = 

2340

1800

4 times

100

1800 x 1.00 = 

1800

1800 + 1800 = 

3600

Содержание PowerHalt PH2

Страница 1: ...SHUT OFF V AL VE AIR INTAKE EMERGENCY SHUT OFF V AL VE PH2AIR INTAKE EMERGENCY SHUT OFFVALVE AUTO MANUAL ELECTRIC WITH PULL CABLE WITH POWERGUARD SMART OVERSPEED LIMITER COMES WITH AUTOMATIC ACTUATION...

Страница 2: ...ensure this may result in hose collapse during valve activation and possible system leaks preventing engine shutdown For excessive vibration applications and installations with long pipe runs addition...

Страница 3: ...ity Knife Torque Wrench KIT CONTENTS A 1 PH2 Manual Electric with Pull Cable Shut off Valve B 8 Tie Straps C 4 Pre Tension Clamps D 2 Silicone hose E 1 Wiring Harness Automatic Actuation Harness Shown...

Страница 4: ...ION Disconnect the battery Remove the engine panels or covers to gain access to the intake hose location where the shut off valve will be installed 2 Remove the stock clamps and hoses from the air cle...

Страница 5: ...59 6A 6B 6C 6D 1 2 3 1 4 2 FIGURE 6A 1 T Handle Bulk Head Fitting 2 M10 Nuts 3 M10 Flat Washers 4 M5 Nut 5 T Handle FIGURE 6B 1 Threaded end fitting 2 M8 Pretention adjusting nuts 3 M8 Flat washers 4...

Страница 6: ...nd washer on either side of the bracket see photo 7C For valves with dual pull cables repeat steps 7 8 Cable pretension is achieved when the T handle M5 jamb nut is just being pulled against threaded...

Страница 7: ...ngle dash wall for install unless the double wall is modified DO NOT ACTIVATE THE MANUAL SWITCH FOR MORE THAN 10 SECONDS Damage to the solenoid may occur 10 Drill a hole in the desired location 11 Ins...

Страница 8: ...n locations that are exposed to high pressure water or locations which can exceed ambient temperatures of 80 C 14 SWITCH INSTALLATION Locate a convenient location on the control panel see photo 14A to...

Страница 9: ...5 8 18 is 20 ft lbs Magnetic pick up diameter 3 4 16 is 62 ft lbs Install the provided magnetic pick up mag into the new tapped hole on the Bell Housing Thread in all the way until the mag contacts th...

Страница 10: ...tion This will have the line direction on the reset knob perpendicular from the air flow direction 3 Reset the valve 4 Activate both pull cable stations 5 Reset valve 6 Start the engine and run 7 Acti...

Страница 11: ...ded that you follow the requirements procedures stated below MONTHLY REQUIREMENTS Inspect all clamps pull cables and support brackets to ensure they are in good condition and to the required torque In...

Страница 12: ...e shut off speed prior to proceeding 1 With the engine idling hold down the SET and TEST buttons simultaneously until both lights begin to ash approximately 5 seconds then release the buttons 2 Press...

Страница 13: ...the engine failed to shut down check for leaks in the piping and consult a PowerHalt representative ERASING THE EXISTING EMERGENCY ENGINE SHUTOFF SPEED 1 Hold both SET and TEST buttons simultaneously...

Страница 14: ...To Customer Connection TOGGLE SWITCH To Mag Pickup Sensor Connection TO MICRO SWITCH To Customer Connection 15A FUSE 5A FUSE BATTERY Micro switch may or may not be included depending on application M...

Отзывы: