Operation
21
STEP 1
Lift the locking tab on the side discharge flap.
STEP 2
Lift the side discharge flap to show the two
discharge chute tabs.
STEP 3
Slot the side discharge chute connecting lugs
onto the horizontal shaft on mower and lower
side discharge flap to secure.
STEP 4
Make sure the side discharge chute is secure
before mowing.
Side Discharge Mowing
With the mulching plug in place, follow steps
below.
STEP 1
Lift the rear discharge flap and insert the two
plastic plugs into the corresponding holes.
Cut And Drop
STEP 2
Lower the rear discharge flap and the mower
is ready for use.
Содержание P5100SPE
Страница 1: ...P1 Petrol Lawn Mower P5100SPE User Manual...
Страница 46: ...46 Notes...
Страница 47: ...Notes 47...
Страница 48: ...48 Notes...
Страница 49: ...Notes 41 49...