4
Disassembly Instructions
While the unit is standing up.
Step 1
Release guy ropes and remove pegs with a claw hammer or peg puller. Do not remove
pegs from the ground by pulling on tent base as this may cause damage to the tent.
Now push any corner in towards the opposite corner to reduce four walls into two
double panels
Step 2
Fold the two double panels together to form one
fl
at level structure and lay it on the
ground.
Step 3
While standing with your feet at the wide base, with your hands about 20cm up each
side of the unit, li
ft
the base to your lap. Li
ft
your hands gradually so the unit slumps
and curves about half way down between the base and top. Bring your hands together
in front of you so that each side touches. You should no
ti
ce that coils are already
forming in the frame
Step 4
While s
ti
ll holding the frame pass your le
ft
hand under your right hand to tuck one coil
sec
ti
on inside the other. Your arms will cross during this step.
Step 5
Place the unit on the ground and even up the size of the coils so the unit can
fi
t into the
carry bag.
Step 6
Slide the Ensuite into the carry bag for storage. Also place pegs into carry bag.
WARNING: At no stage is it necessary to apply any excessive force to achieve any of
the above steps. The steel frame is sprung loaded and if the correct ac
ti
on is applied
the beach dome will pack up with li
tt
le or no force required. Excessive force will
result in damage to the frame and this is not covered by warranty.
Содержание DTMENSPU-B
Страница 5: ...5 Disassembly Instructions 1 2 3 4 5 6...
Страница 11: ...11 Notes...