background image

 

Manual 

 

                                                                                                                                     

www.industrisal-needs.com

 

 

 

Table Of Contents 

1

 

Initial operation ..............................................................................................................2

 

2

 

Safety Precautions ........................................................................................................2

 

3

 

Specified Application .....................................................................................................3

 

4

 

Operation mechanism ...................................................................................................4

 

5

 

How to set up the device...............................................................................................4

 

6

 

Detailed description and operation procedure .............................................................5

 

6.1

 

Turn on device ...........................................................................................................................6

 

6.2

 

Start operation ...........................................................................................................................6

 

6.3

 

Select operation time .................................................................................................................6

 

6.4

 

Select performance level of air fan .............................................................................................6

 

6.5

 

Shut down operation program ....................................................................................................6

 

7

 

Initiation .........................................................................................................................6

 

7.1

 

Important notes prior to initiation ................................................................................................6

 

7.2

 

Tips on determining the operation period ....................................................................................7

 

8

 

Shutdown .......................................................................................................................7

 

9

 

Technical Specifications ...............................................................................................8

 

10

 

Transportation ...............................................................................................................8

 

11

 

Care and maintenance ..................................................................................................8

 

12

 

Bug fixing .......................................................................................................................9

 

13

 

Optional Equipment / Replacements ............................................................................9

 

14

 

Disposal .......................................................................................................................10

 

 
 
 

 

Содержание XT - series

Страница 1: ...2 09 2014 www industrial needs com PCE Instruments UK Ltd Units 12 13 Southpoint Business Park Ensign Way Southhampton Hampshire United Kingdom SO31 4RF Phone 44 0 2380 98703 0 Fax 44 0 2380 98703 9 info industrial needs com www industrial needs com ...

Страница 2: ...rocedure 5 6 1 Turn on device 6 6 2 Start operation 6 6 3 Select operation time 6 6 4 Select performance level of air fan 6 6 5 Shut down operation program 6 7 Initiation 6 7 1 Important notes prior to initiation 6 7 2 Tips on determining the operation period 7 8 Shutdown 7 9 Technical Specifications 8 10 Transportation 8 11 Care and maintenance 8 12 Bug fixing 9 13 Optional Equipment Replacements...

Страница 3: ...autions CAUTION The device generates ozone Keep in mind that ozone is toxic and may not be inhaled Please read the following instruction manual before operating with the device Damages caused by disregard of the instructions written in this manual are excluded from any warranty or liability Do not enter the treated room during the device s operation or before the ozone level in the air has adapter...

Страница 4: ...ith ozone must be followed Ozone is a toxic oxidizing agent and proves to be hazardous and harmful to the health There are certain safety measures that must be followed to avoid an uncontrolled release of the gas CAUTION Ozone cannot be inhaled It causes a reduced lung efficiency which can continue for several days Safety measures and equipment Wear masks with ozone filters which cover the eyes mo...

Страница 5: ... out the ozone containing air back into the surrounding air The ozone in this device is generated without the help of any further chemicals or utilities It only uses electrical energy and surrounding air Thus it causes no environmental pollution After the device is switched off again the remaining ozone dissociates after some time into Oxygen again 5 How to set up the device If you set up the devi...

Страница 6: ...modes Fig 1 Layout of control panel on remote control All operation modes can be set by means of the remote control or the control panel on the device as shown below Autom Timer Operation period of the device 15 min 2 hrs Operation indicated by red LED Button to program timer Performance level of air fan level I level II operation indicated by red LED Button to program Air Fan Ozone production Ope...

Страница 7: ...an chose the relevant air fan level directly on the remote control 6 5 Shut down operation program All programs can be immediately shut down via the OFF switch red button on remote control After pressing it the device immediately switches into Standby mode and can be programmed again 7 Initiation Check prior to every initiation whether the inlet and outlet for the air fain has no foreign matter in...

Страница 8: ...itial non toxic state or reaches the MAK level of 0 1 ppm depends on various factors like the air humidity the treated material size of the room period of treatment etc The treated rooms need to be checked on their ozone concentration by trained and authorized personnel before they become open for access again The mean half life of ozone is 30 min depending on temperature air pressure UV radiation...

Страница 9: ...cially the Ceramic Dielectric Electrode requires regular maintenance since it is often covered with contaminants To determine the necessary interval for maintenance consider your operation frequency and the surrounding conditions in which the device is operates If it was a dusty and dirty surrounding or if it is a renovation after fire you should check whether the device requires any maintenance D...

Страница 10: ...e sure the electrode is absolutely dry before operating again If you the electrode is much heavier polluted you might have to demount the electrode a Loosen the electrode from its attachment since they are only clipped in b After demounting the plate it can be cleaned carefully under clear water with a mild soap solution e g dishwashing detergent c The device can be remounted after it has fully dr...

Страница 11: ...nd an overview of our measuring devices http www industrial needs com measuring instruments htm Here you will find an overview of our scales and balances http www industrial needs com balances htm Here you will find an overview of our laboratory equipment http www industrial needs com laboratory equipment htm Here you will find an overview of our control systems http www industrial needs com contr...

Отзывы: