4.2.3
Install the gate leaf on the post using mounting screws. Make
sure that the gate leaf is securely fastened to the post.
4.2.4
Figure 2 - mark and drill 4 holes with a diameter of 16 mm in the
floor for the gate post anchors.
Figure 2 - Dimensions of installation site
Depth of the holes for embedded parts should exceed anchor length by 5
mm. Insert the anchors into the holes.
4.2.5
In cable duct or channel, lay control panel connection cable,
power supply cable and, if provided, cables for ACS and security and fire alarm
system.
4.2.6
Install the gate post on the prepared place.
4.2.7
Insert in the gate cables from control panel, power supply and, if
necessary, cables for ACS and security and fire alarm system.
Perform cabling through a hole with a diameter of 20 mm. Fasten the
cables with cable ties.