VZR.248100.000 IG
K-14 Swing gate
Installation Guidelines
10
4.2.8
Match the holes in the gate base with the anchors in the floor.
4.2.9
Check the gate verticality in 2 planes using, if necessary, steel
gaskets of the required thickness for correct installation of the gate.
4.2.10 Fasten the gate base flange with 4 M10 screws by screwing
them into the appropriate anchors with a wrench S6.
4.3 The product dismantling
4.3.1
The product dismantling for sending for inspection or repair
should be performed in the following order:
1)
turn off the product power;
2)
disconnect the product from the power supply;
3)
disconnect the cable part of the product from the additional cables;
4) dismantle
the product from the installation site.
4.3.2
Before packing, clean the product of dust and dirt.
4.3.3
Pack the product in a packing box.