VZR.248100.000 IG
K-14 Swing gate
Installation Guidelines
11
5
CONNECTION AND ADJUSTMENT OF THE PRODUCT
Figure 3
– components arrangement on the gate post.
Connection of power supply, control panel and ACS should be carried out
by means of the cross-board.
Figure 3 -
Components arrangement
on the gate post
1 - Cover; 2
– Insert; 3 - Indication panel; 4- Body housing;
5
– Cap; 6- Glass; 7- Upper housing; 8 - Location of cross-board