VZR.235900.000 IG
Cube С-04 Turnstile
Installation Guidelines
6
3.
PREPARING THE PRODUCT FOR INSTALLATION
3.1 Procedure for transporting the product to installation site
The product in factory packaging can be transported by air, closed motor and
railroad transport means when fitted with protection against direct exposure to
precipitation and dust without distance limitation.
After shipment under subzero temperature, the product shall be kept in a
room under normal climatic conditions during 12 hours to avoid moisture
condensation.
When carrying out handling operations, safety requirements shall be
observed.
3.2 Product unpacking rules
3.2.1
Inspect the package externally. The package shall have no visible
damages.
3.2.2
Open the transportation box, unpack it and examine the product
composition:
1)
turnstile stand;
2)
RC panel with cable;
3)
latch keys (4 pcs).
3.3 Product inspection rules
3.3.1
Check the completeness of the set.
Check the completeness of the set in accordance with Datasheet
VZR.235900.000 DS.