![Overland Storage PowerLoaders AIT-2 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/overland-storage/powerloaders-ait-2/powerloaders-ait-2_user-and-installation-manual_1663070030.webp)
2-6
u
Installation
S
ETTING
U
P
THE
R
ACK
M
OUNT
M
ODEL
Install Top Cover
With the tabletop cover removed, install a sheet metal top cover that protects the
PowerLoader™ interior components when mounted in a rack (
.
1) Place the top cover over the PowerLoader™ chassis top with each side flange to the outside of
the chassis.
2) Slide the cover forward until it is flush with the front panel.
3) Fasten the cover with two screws (4M x 8mm).
4) Remove the four rubber feet on the bottom of the PowerLoader™.
Figure 2–5. Installing the Top Cover
En ter
Es cape
Ready
Use
Cleane
r
Drive
Fau lt
Lo ader
Fau lt
Side Flanges
LP-0011
Slide Flanges
Содержание PowerLoaders AIT-2
Страница 1: ......
Страница 4: ...ii u...
Страница 13: ...xi LIST OF FIGURES CONT D...
Страница 14: ...xii LIST OF FIGURES CONT D...
Страница 16: ...xiv LIST OF TABLES CONT D...
Страница 26: ...2 2 u Installation RELEASING THE LOCKDOWN MECHANISM Lockdown Screw...
Страница 52: ...2 28 u Installation CONFIGURATION OPTIONS DESCRIPTION...
Страница 96: ...5 18 u Troubleshooting ERROR RECOVERY...
Страница 102: ...A 6 u Specifications SPECIFICATIONS...
Страница 104: ...B 2 u...