1. Check local building codes.
• Does building code require permanent wiring?
– If not, skip to step 9.
–
If yes, have an electrician perform steps 2
through 8.
To reduce the risk of electrical shock, this
equipment has a grounding type plug that has a
third (grounding) pin. This plug will only fit into a
grounding type outlet. If the plug does not fit into
the outlet, contact a qualified electrician to install
the proper outlet. DO NOT change the plug in
any way. The door operator must be properly
grounded to prevent personal injury and damage
to the components.
The electrical power to the door operator MUST
BE removed when motor cover is removed.
Electrical power must remain off while making
electrical connections.
WARNING
4
...
CONNECTING POWER
FOR HELP-1.800.929.3667 OR OVERHEADDOOR.COM
Instructions for electrician.
2. Remove power from circuit.
3. Remove motor cover (Fig. 4-2).
• Push in on release tabs (Fig. 4-2) while pulling
down on front of lens cover until cover snaps open.
• Remove 4 screws on motor cover.
– Slide motor cover down.
4. Remove and discard power cord .
• Cut off power cord inside power head (Fig. 4-3).
NOTE: There must be at least 6 inches of black
and white wire inside the power head.
• Remove knock-out plug, strain relief, and power
cord (Fig. 4-4). (Cut ground on line side of toroid.)
• Dispose of plug, relief and cord.
5. Install suitable entrance bushing.
6. Connect permanent wiring to power head wires.
• Connect white supply line to white wire.
• Connect black supply line to black wi
• Connect ground to green wire (ground).
NOTE: Use only U.L. recognized wire nuts
7. Replace motor cover (Fig. 4-2).
• Replace and tighten 4 screws.
• Close lens cover.
8. Reconnect power to circuit.
9. Plug in door operator.
• See warning above.
• Plug door operator into a grounded outlet.
• Perform STB
®
alignment check (Fig. 4-1).
NOTE: Circuit boards are light sensitive. Make
sure the cover is installed before energizing the
garage door operator.
CONNECT POWER WITH PERMANENT WIRING
Two screws per
side on motor
cover
Push in
to release
Knockout
Cut wires here
CONNECT POWER WITH PLUG
Fig. 4-2 Remove Cover
Fig. 4-4 Remove knockout
Fig. 4-3 Cut off power cord
Safe-T-Beam
®
Alignment Check
Fig. 4-1
After turning the electrical power on, if the
STB’s are not in proper alignment, the red
LED (Source) will blink continuously.
To correct the problem – the brackets are
flexible and can be adjusted slightly to bring
the system into alignment.
When the STB’s are in alignment the red LED
will stop blinking and stay on.
20