Mounting Straps
Fig. 1-29 Mounting Methods
“C”
“C”
Top of door
ONE-PIECE Doors
Fig. 1-30A Install Door Bracket
OPEN BEAM CEILING
[30]
Top of door
“C”
SECTIONAL Doors
FOR SECTIONAL DOORS
11. Install door bracket (Fig. 1-30A).
• Contact door distributor.
• Locate on centerline, no lower than top rollers
(Fig. 1-30B).
• Attach using self-drilling screws [56] for
metal doors, or
Use lag screws [30] for wooden doors. (Check
length of screws vs thickness of door prior to
use. Your door may require shorter screws.)
NOTE: PRIOR TO PROCEEDING WITH STEP 11 —
CONTACT DOOR DISTRIBUTOR FOR INSTRUCTION / ASSIS-
TANCE ON INSTALLING THE DOOR BRACKET
Doors made of masonite, lightweight wood, fiberglass,
and metal must be properly braced before mounting
door operator.
15
Even with or above top roller. See Fig. 1-31
FOR 1-PIECE DOORS
11A. Install door bracket (Fig. 1-31).
• Contact door distributor.
• Mount on centerline as high on the door
as possible.
• Attach using self-drilling screws [56] for
metal doors, or
Use lag screws [30] for wooden doors. (Check
length of screws vs thickness of door prior to
use. Your door may require shorter screws.)
CAUTION
FOR HELP-1.800.929.3667 OR OVERHEADDOOR.COM
10. Install door brace if needed (See caution below).
1/4" x 2" Lag Screw
1/4"-20 x 3/4" Self-Drilling Screw
[30]
[56]
Attach at highest
possible point on door.
Fig. 1-31 Install Door Bracket
“C”
“C”
Top of door
15
[11]
[55]
[30]
NOTE: Read all instructions completely.
Garage constructions differ, so it may be
required to supply extra material and
modify instructions.
NOTE: Materials may vary.
FINISHED CEILING
Locate the ceiling joists or
trusses using a stud finder
or similar device.
Attach angle iron
(not included on
all models) to joists
through the
finish material
using lag
screws (30).
[30]
[11]
[55]
Fig. 1-30B Install Door Bracket
even with or
above top roller
Perforated Angle Iron