background image

HARDWARE CONTENTS 

 Screw

ST4X15

 Qty. 6

Brass cap &

    fitting

 

    Qty. 6

Allen key

 2.5 mm

  Qty. 1

Allen key

  4 mm

  Qty. 1

DD

HH

CC

BB

 

 EE

 

  Screw

 ST4X20

 

   Qty. 2

 Screw

ST4X30

 

 Qty. 8

 Screw

ST5X35

 Qty. 2

Wall plug

  ø6X30

 

  Qty. 8

AA

II

JJ

 KK

5

Wall plug

  ø8X30

   Qty. 2

LL

MM

Large cap

 

   Qty. 4

Small cap

 

   Qty. 8

Содержание JERSEY

Страница 1: ...ng to your retailer call our customer service department at 1 866 839 2888 9 a m 5 p m EST Monday Friday 1 OVE102012 Purchase date _________________ Product Tracking Reference ________________________...

Страница 2: ...Package Contents 3 Hardware Contents 5 Safety Information 6 Preparation 6 Installation Instructions 7 Maintenance 14 Warranty 14 TABLE OF CONTENTS 2...

Страница 3: ...PACKAGE CONTENTS A F E D C F M M L L I K J G H R S N O Q P B 3...

Страница 4: ...bber track 1 99SRU0006 H PVC magnetic door seal 2 99SRU0021 I Rubber strip Long 1 99SRU0033 J Bottom rubber track 1 99SRU0009 K Rubber strip Short 1 99SRU0003 L Glass support bracket 2 99SGC0012 WM M...

Страница 5: ...6 Brass cap fitting Qty 6 Allen key 2 5 mm Qty 1 Allen key 4 mm Qty 1 DD HH CC BB EE Screw ST4X20 Qty 2 Screw ST4X30 Qty 8 Screw ST5X35 Qty 2 Wall plug 6X30 Qty 8 AA II JJ KK 5 Wall plug 8X30 Qty 2 LL...

Страница 6: ...stallation is complete Inspect all parts for damage if there is damage to the unit prior to installation please contact your distributor Install the shower on a floor that is level and able to accommo...

Страница 7: ...STEP A The center of one metal track should be 30 1 2 in 775 mm from the wall And the center of another metal track should be 58 1 2 in 1486 mm from the wall The two metal tracks should be placed at a...

Страница 8: ...ed hole is attained 1 Level the tracks F and mark the track holes positions Temporary removes the frames and ensures that the distance is correct 2 Drill pilot holes at the marked place Ensure that th...

Страница 9: ...at the base of glass panels C E and cut it to size 2 Place the seal strips K at the base of the glass E and cut it to size 3 Insert glass panels C E into the tracks F Do not fully tighten hardware as...

Страница 10: ...are on the glass panel 2 Install the bottom rubber track J on the shower door D and cut it to size The longer lip of the strip must be in the internal side of the shower 3 Install the PVC magnetic do...

Страница 11: ...on shower base Remove glass support bracket L and rubber gasket FF Drill a hole in the shower base using the drill 3 Add a drop of silicone to the drilled hole Put back the rear bracket and the rubbe...

Страница 12: ...marked line on the wall mark the two holes position of the bracket plate 8 Drill the two holes on the marked place 9 Insert the wall anchors AA then mount the wall bracket plates on the wall using scr...

Страница 13: ...ection between the side glass panel and the frame as well as the support bar 3 Apply a clear silicone water sealant around the inside and the outside perimeter of any fixed shower components horizonta...

Страница 14: ...rkmanship and materials under normal use and service for a period of one 1 year Distributor will at its election repair replace or make appropriate adjustment where distributor optional inspection dis...

Отзывы: