background image

INSTALLATION INSTRUCTIONS

STEP E
1. Using a cutter, remove exposed rubber strips where the glass support brackets (L) are to be installed. 
2. Place rear part of bracket (L) and one rubber gasket (FF) centered in the notch as illustrated and mark 
    location of hole to drill on shower base. Remove glass support bracket (L) and rubber gasket (FF). 
    Drill a hole in the shower base using the drill.

3. Add a drop of silicone to the drilled hole; Put back the rear bracket and the rubber seal and tighten using the 

    screw (EE).
4. Place the front bracket and the rubber seal and tighten with fixing screw (GG) using the Allen key (JJ).
5. Cut the vertical rubber track (G) to size and place it on the edge of fixed glass panel.

2

3

1

4

EE

ø 3

FF

GG

L

CUT

G

5

11

Содержание JERSEY

Страница 1: ...ng to your retailer call our customer service department at 1 866 839 2888 9 a m 5 p m EST Monday Friday 1 OVE102012 Purchase date _________________ Product Tracking Reference ________________________...

Страница 2: ...Package Contents 3 Hardware Contents 5 Safety Information 6 Preparation 6 Installation Instructions 7 Maintenance 14 Warranty 14 TABLE OF CONTENTS 2...

Страница 3: ...PACKAGE CONTENTS A F E D C F M M L L I K J G H R S N O Q P B 3...

Страница 4: ...bber track 1 99SRU0006 H PVC magnetic door seal 2 99SRU0021 I Rubber strip Long 1 99SRU0033 J Bottom rubber track 1 99SRU0009 K Rubber strip Short 1 99SRU0003 L Glass support bracket 2 99SGC0012 WM M...

Страница 5: ...6 Brass cap fitting Qty 6 Allen key 2 5 mm Qty 1 Allen key 4 mm Qty 1 DD HH CC BB EE Screw ST4X20 Qty 2 Screw ST4X30 Qty 8 Screw ST5X35 Qty 2 Wall plug 6X30 Qty 8 AA II JJ KK 5 Wall plug 8X30 Qty 2 LL...

Страница 6: ...stallation is complete Inspect all parts for damage if there is damage to the unit prior to installation please contact your distributor Install the shower on a floor that is level and able to accommo...

Страница 7: ...STEP A The center of one metal track should be 30 1 2 in 775 mm from the wall And the center of another metal track should be 58 1 2 in 1486 mm from the wall The two metal tracks should be placed at a...

Страница 8: ...ed hole is attained 1 Level the tracks F and mark the track holes positions Temporary removes the frames and ensures that the distance is correct 2 Drill pilot holes at the marked place Ensure that th...

Страница 9: ...at the base of glass panels C E and cut it to size 2 Place the seal strips K at the base of the glass E and cut it to size 3 Insert glass panels C E into the tracks F Do not fully tighten hardware as...

Страница 10: ...are on the glass panel 2 Install the bottom rubber track J on the shower door D and cut it to size The longer lip of the strip must be in the internal side of the shower 3 Install the PVC magnetic do...

Страница 11: ...on shower base Remove glass support bracket L and rubber gasket FF Drill a hole in the shower base using the drill 3 Add a drop of silicone to the drilled hole Put back the rear bracket and the rubbe...

Страница 12: ...marked line on the wall mark the two holes position of the bracket plate 8 Drill the two holes on the marked place 9 Insert the wall anchors AA then mount the wall bracket plates on the wall using scr...

Страница 13: ...ection between the side glass panel and the frame as well as the support bar 3 Apply a clear silicone water sealant around the inside and the outside perimeter of any fixed shower components horizonta...

Страница 14: ...rkmanship and materials under normal use and service for a period of one 1 year Distributor will at its election repair replace or make appropriate adjustment where distributor optional inspection dis...

Отзывы: