46.
Screw first filler shingle down to
rafters using 1 - 2 1/2” screw per panel.
Make sure to screw into rafter.
47.
Slide in another filler shingle and attach as
per
Step 46.
On your last row of shingles, the
filler shingle is precut to fit properly. Attach to
roof with 2 finishing nails per shingle.
Attach above the
exposure line.
Exposure Line
45.
Roof
Filler Shingles
are included to cover
roof seams. Starting at the bottom, slide the first
24” long shingle in until flush with other bottom
shingles.
DO NOT ATTACH UNTIL STEP 46.
Outside Panel
Middle Panel
Outside Panel
43.
Position and attach Front Roof Panels as per
Steps 39-42.
44.
To further secure roof panels, from the inside,
locate pre-drilled holes in Mid Rafters. Using 2 - 3”
screws, secure rafters to roof battens.
Note,
from
outside, push roof panel down so batten sit flush
against rafter when securing. Also position 2
Simpson Strong ties on battens and outside rafters
and secure 4 - 1 1/4” screws. 8 ties in total.
Strong Ties
3” screws
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 18