36.
Roof Gussets
are positioned on middle rafters. Prior
to attaching
,
make sure front and rear walls are properly
aligned. Have two helpers push the front and rear walls at
the top from the outside of shed until inside to inside
measurement between front and rear plates is 70”. When
correct, slide gusset up, use level to square gusset and
attach to rafters with 4 - 1 1/4” screws.
37.
Complete remaining 2 Gussets as
per
Step 36.
Shingles overhang battens
on outside panels.
Shingles and battens
flush on middle panel.
Roof facing
down with
roofing felt
showing.
Outside Roof Panel.
70
“ Across
38.
Attach
Simpson Strong Ties
to Top Wall framing and plates and also to the underside of the
rafters. Use 4 - 1 1/4” screws to secure. There are 7 Ties per side.
39.
Identify all
Roof Panels.
There are 4 Outside and 2 Middle Roof Panels. Outside Panels will have
shingles overhanging the battens on 1 end. Lift up and place an Outside Roof Panel on Rafters.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 16