15.
Complete attachments of remaining Interior
Joists.
17.
Carefully lift completed Floor Joist Frames and position on Elevated Platform so long floor
joists run perpendicular with interior floor joists of platform.
16.
Next, attach
Floor Joist Frames.
Frames require two interior Floor Joist attachments.
Measure Joist (8 1/4”) from inside of Floor Joist Frame to inside of Floor Joist and attach with 2 - 2
1/2” screws per end. Complete attachments of both Floor Joists and both Floor Joist Frames.
8 1/4”
12 1/4”
2 1/2”
screws
IMPORTANT:
The Little Squirt Elevated Platform is
now complete. To complete the Floor Section, use
parts from the Standard Little Squirt Playhouse
Assembly Manual with one exception. Floor Runners
are not required. Please use
Steps 16 - 23 in this
Manual
for correct Floor Assembly Procedure.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8