71 3/4”
66 1/2”
Approx. 1/4” Gap between Post
Mount and Front Girder
Front
Girder
Side Girder
Side
Girder
Support
Post
Side Girder Flush
with Post Mount
3/8” Gap between Support
Post and Front Girder
66 1/2” Outside to
Outside of Post Mount
1/8” Thick
Plate
4.
Place Post Mount in
wet Concrete Form and
position as illustrated.
Side
Front
Picture illustrates Support
Post installed. Post is not
required on this however.
5.
Complete positioning of all Post Mounts. Measure and confirm that it is level. Adjust as
required. Allow concrete form to set as per manufacturer’s recommendations.
Front
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 4