7
5
6
6-1. Remove the 4 bolts from the burner.
6-2. Put the gas hose through into the post.
6-3. Fix the burner unit to the post by the 4 bolts.
5-1. Insert the screw coupler on the pole, inserting it through the middle
of the table on the pole. Thread the tightening spacer on the bottom of
the table counterclockwise onto the screw coupler.
5-2. Tighten securely to hold the table to the screw coupler. Thread the
fastening nut counterclockwise. Tighten securely to lock in place.
Loosen the fastening nut to adjust the position of the table on the pole.
Screw Coupler
Bolt