background image

member of The            Group

TM

Worldwide Corporate O

ffices

North America

 

Tel: +1 360.435.6030 
Fax: +1 360.435.6019

Europe

 

Tel: +49 9122.79889.0 
Fax: +49 9122.79889.21

Latin America

 

Tel: +1 561.792.9651 
Fax: +1 561.792.7157

Asia Pacific

 

Tel: +852 2736.8663 
Fax: +852 2199.7988

031-331-B1-001 Rev. A (11/2015)

System Shutdown, 

Morningstar TriStar MPPT-30 Charge Controller

1.  Open the load output circuit breaker (the Green LED on the LVD will remain on).

2.  Open the PV module circuit breaker.

3.  Open the DC bus master circuit breaker (the Green LED on the LVD will turn off at this time).

4.  Open any connected battery breakers.

5.  Measure across the Load positive (+) and Load negative (–) on the charge controller. Verify a reading of 0 Vdc, indicating  

the system is offline.

A

B

C

D

Illustration of Morningstar TriStar MPPT-30 Charge Controller courtesy of Morningstar Corp.

A

PV module breaker 

B

DC bus breaker

C

Low voltage disconnect (LVD)

D

Load output breaker

WARNING: Electrical Hazard

Prior to beginning the shutdown procedure, cover the PV modules with opaque material to prevent the conversion of light energy 
into DC power.

CAUTION: Hazard to Equipment

Opening the battery breakers before opening the PV or load breaker will damage the charge controller.

CAUTION: Hazard to Equipment

The master battery breaker must be opened during periods of no solar input that extend beyond the rated 3 day blackout 
autonomy e.g. solar panel service, prolonged snow cover, debris build up on panel. Failure to either recharge the batteries or open 
the master battery breaker during an extended outage may result in permanent damage to the batteries.

Содержание smartharvest

Страница 1: ...ll Battery Owner s Manual OutBack Power Technologies p n 900 0127 01 00 Audience This guide is intended for experienced installers familiar with the mechanical and electrical requirements of photovolt...

Страница 2: ...procedure components could create hazards obstructing free movement and leading to serious bodily injury These hazards are at head eye level The use of head and eye protection is required IMPORTANT T...

Страница 3: ...attach the PV module to the rails 1 2 1 2 PV module SmartHarvest Charge Controller connections PV module positive Connect to the lower position of PV input circuit breaker PV module negative Connect...

Страница 4: ...acid contacts skin or clothing wash immediately with soap and water If acid enters the eye immediately flood it with running cold water for at least 20 minutes and get medical attention as soon as po...

Страница 5: ...Charge Controller connection detail including optional battery sense wiring and remote temperature sensor wiring Battery temperature sensor optional connect to battery terminal Battery sense wire conn...

Страница 6: ...ads 2 Recharge battery Yellow LED not on Charge battery Charging to wrong voltage 1 Check position of battery selection jumper 2 Check installation of thermistor Load not powered Check minimum load fo...

Страница 7: ...tive String 3 positive String 1 negative String 2 negative String 3 negative Load connections Battery bus to LVD positive LVD negative to negative bus bar LVD Load to Load output circuit breaker DC ou...

Страница 8: ...Confirm the polarities of the PV module wiring and Battery string wiring are correct 2 Close the connected battery string breakers 1 through 3 3 Close the master battery disconnect The LEDs on the cha...

Страница 9: ...0 Vdc indicating the system is offline A B C D IllustrationofMorningstarTriStarMPPT 30ChargeControllercourtesyofMorningstarCorp A PV module breaker B DC bus breaker C Low voltage disconnect LVD D Load...

Отзывы: