Installation and Operation 

 

900-0230-01-00 Rev A 

Battery Configurations 

 

Figure 4 

Series String Configurations 

 

 

Figure 5 

Parallel String Configuration 

 

Series String (24 Vdc)

 

Series String (48 Vdc)

 

Load +

 

Load –

 

Load + 

Load –

 

Batteries are placed in series (negative to positive) for additive voltages.  Batteries in series 
are known as a “string”.  A string of two EnergyCell batteries has a nominal voltage of 24 
Vdc and can be used for 24-volt loads.  A string of four has a nominal voltage of 48 Vdc.  
Other voltages are possible.  However, batteries in series do not have additive amp-hours.  
A single string of any voltage (as shown above) has the same amp-hours as a single battery. 

When replacing batteries, a new battery should not be placed in series with old batteries.  
This will cause severe stress and shorten the life of all batteries.  All batteries in a string 
should be replaced at the same time. 

Batteries are placed in parallel (positive to 
positive, negative to negative) for additive amp-
hour capacity.  Three batteries in parallel have 
three times the amp-hours of a single battery.  
However, batteries in parallel do not have 
additive voltages.  A single set of batteries in 
parallel (as shown in this figure) have the  
same voltage as a single battery. 

NOTE

:

  Use caution when designing or building 

systems with more than three EnergyCell 
batteries or strings in parallel.  The extra 
conductors and connections used in larger 
paralleled systems can lead to unexpected 
resistances and imbalances between batteries.  
Without proper precautions, these factors will 
reduce the system efficiency and shorten the life 
of all batteries.  For systems beyond three 
strings, contact an OutBack representative. 

Parallel Batteries

 

Load Bus +

 

Load Bus –

 

Содержание EnergyCell 200PLR

Страница 1: ...EnergyCell PLR Series Owner s Manual...

Страница 2: ...ROVIDED IN ITS MANUALS OR OTHER DOCUMENTATION b ASSUMES NO RESPONSIBILITY OR LIABILITY FOR LOSS OR DAMAGE WHETHER DIRECT INDIRECT CONSEQUENTIAL OR INCIDENTAL WHICH MIGHT ARISE OUT OF THE USE OF SUCH I...

Страница 3: ...ratures 6 Self Discharge 7 Storing EnergyCell PLR Batteries 7 Capacity 7 State of Charge 8 System Layout 8 Battery Configurations 9 DC Wiring 11 Commissioning 13 Charging 13 Bulk Stage 13 Absorption S...

Страница 4: ...e batteries Always use insulated tools Avoid dropping tools onto batteries or other electrical parts Keep plenty of fresh water and soap nearby in case battery acid contacts skin clothing or eyes Wear...

Страница 5: ...y to identify any potential safety risks before proceeding The owner must be familiar with all the features and functions of this battery before proceeding Failure to install or use this battery as in...

Страница 6: ...cluding temperature deratings and any other code concerns Storage and Environment Requirements Temperatures o To achieve maximum life of EnergyCell PLR batteries it is recommended not to operate them...

Страница 7: ...stored up to 48 months at 50 F 10 C without a charge Stored batteries should be checked for open circuit voltage at intervals Any time the battery voltage is less than 2 10 Vpc volts per cell this equ...

Страница 8: ...in emergency backup systems However the best practice is to avoid discharging below 50 If operated in a range with consistent charge and discharge to 50 DoD or above the EnergyCell will typically have...

Страница 9: ...s will cause severe stress and shorten the life of all batteries All batteries in a string should be replaced at the same time Batteries are placed in parallel positive to positive negative to negativ...

Страница 10: ...24 Vdc twice the nominal voltage They also have double the amp hour capacity of a single battery Two parallel strings of four batteries in series have a nominal voltage of 48 Vdc at double the amp hou...

Страница 11: ...hardware in the order illustrated The lug or interconnect should be the first item installed It should make solid contact with the mounting surface Do not install hardware in a different order than sh...

Страница 12: ...cess as appropriate for batteries 2 3 and any others in the string Connect the proper number of batteries in series for the nominal voltage of the load 6 If multiple series strings will be used repeat...

Страница 13: ...mum current limit see Table 3 on page 21 which should not be exceeded At excessive current rates the battery s efficiency of conversion becomes less and it may not become completely charged The batter...

Страница 14: ...usively the absorption time it produces may not always be accurate The best way to accurately charge batteries is to use the FLEXnet DC or an equivalent battery monitor and the Charge Termination Cont...

Страница 15: ...more easily However it will not deliver all the required current and the battery will tend to be undercharged Conversely when the battery is warmer than room temperature its internal resistance goes...

Страница 16: ...way can result from high ambient temperatures charging at higher voltages over extended time incorrect temperature compensation or shorted cells When the buildup of internal heat exceeds the rate of c...

Страница 17: ...abuse Replace battery as necessary Heat damage or melted grease at terminals Loose or dirty cable connections Check and clean all connections Physical damage on terminals may require the battery to b...

Страница 18: ...EnergyCell Batteries 18 900 0230 01 00 Rev A This page intentionally left blank...

Страница 19: ...pect for contamination by dust Inspect for loose or corroded connections If necessary isolate the string battery and clean with a damp soft cloth Do not use solvents or scouring powders to clean the b...

Страница 20: ...ection This should include the monthly and quarterly observations plus o Inter cell inter unit connection integrity o Retighten terminals to specified torque values See Table 2 on page 21 for specific...

Страница 21: ...tial Torque 44 4 in lb 5 0 5 Nm Weight 132 3 lb 59 9 kg Dimensions H x D x W 12 46 22 87 4 92 31 65 x 58 09 x 12 5 cm Warranty 3 year full replacement Accessories Ships with interconnect bars terminal...

Страница 22: ...EnergyCell Batteries 22 900 0230 01 00 Rev A NOTES...

Страница 23: ...Specifications 900 0230 01 00 Rev A 23 This page intentionally left blank...

Страница 24: ...Masters of the Off Grid First Choice for the New Grid Corporate Headquarters 17825 59th Avenue N E Suite B Arlington WA 98223 USA European Office Hansastrasse 8 D 91126 Schwabach Germany...

Отзывы: