Final assembly of orthosis joint
►
Use the 633F7 special lubricant to grease the metal.
►
Secure the screw connection with Loctite 241.
INFORMATION
Delivery of finished orthosis to the patient
Prior to delivery of the orthosis to the patient, the fit, support and all func
tions must be tested.
Pay attention to the parallel alignment of the orthosis joints.
Check the locking mechanism and instruct the patient in handling the lock
and the product.
INFORMATION
Instruct the patient not to unlock the orthotic knee joints under load.
6 Patient information
Inform the patient:
Verify lock functionality
►
Before standing up, check that both locks are engaged. Carry out a
function test.
Inspect the orthosis for damage
►
Inspect the orthosis for damage daily, paying special attention to the
locks and bars. Contact the qualified personnel promptly if changes are
noted.
7 Cleaning
System joints must be cleaned promptly after contact with water containing
salt, chlorine or soap, or when they get dirty.
1) Rinse system joints with clean fresh water.
2) Dry system joints with a cloth or allow to air dry. Avoid exposure to direct
heat (e.g. from an oven or radiator).
8 Maintenance
INFORMATION
The product may be exposed to increased loads by the patient.
►
Shorten the maintenance intervals according to the expected loads.
18
Содержание 17HF1 Series
Страница 2: ...17HF1 1 2 ...
Страница 3: ...17HL1 2 3 ...
Страница 4: ...17HL4 3 4 ...
Страница 126: ...126 ...
Страница 127: ...127 ...