MSG-A • MSG-D OPERATOR INSTALLATION GUIDE
- 3 -
Read the following before beginning to install OSCO swing
gate operators:
1. Read the orange “Safety Instructions” brochure enclosed
with the packet of information. If you do not have one,
please call OSCO at 1-800-333-1717 to request one. Read
and follow all instructions.
2. All electrical connections to the power supply must be
made by a licensed electrician and must observe all
national and local electrical codes.
3. A separate power-disconnect switch should be located
near the operator so that primary power can be turned off
when necessary.
4. Install the enclosed warning signs on both sides of the
gate. Each sign must be plainly visible from the side of
the gate on which they are mounted.
5. Never reach between, through or around the fence to
operate the gate.
6. You must install all required safety equipment.
GATE OPERATOR
CLASSIFICATIONS
All gate operators can be divided into one of four different
classifications, depending on their design and usage.
Class I Residential Vehicular Gate Operator
A vehicular gate operator intended for use in a home of one to
four single family dwellings, or garage or parking area associ-
ated with these dwellings.
Class II Commercial / General Access Vehicular Gate
Operator
A vehicular gate operator intended for use in a commercial
location or building such as a multifamily housing unit of five
or more single family units, hotel, retail store or other building
servicing the general public.
Class III Industrial / Limited Access Vehicular Gate
Operator
A vehicular gate operator intended for use in an industrial
location or building such as a factory or loading dock area or
other location not intended to service the general public.
Class IV Restricted Access Vehicular Gate Operator
A vehicular gate operator intended for use in a guarded indus-
trial location or building such as an airport security area or
other restricted access locations not servicing the general
public, in which unauthorized access is prevented via supervi-
sion by security personnel.
PRE-INSTALLATION
INFORMATION
Before unpacking, inspect the carton for exterior damage. If
you find damage, advise the delivery carrier of a potential claim.
Inspect your package carefully. You can check your
accessory box parts with the enclosed packing slip for your
convenience. Claims for shortages will be honored for only 30
days from the date of shipment.
Before installing the operator, read this manual completely
to ensure all requirements for proper installation are present.
Verify that the voltage to be used matches the voltage of the
operator.
SAFETY INFORMATION
AND WARNINGS
IMPORTANT!!
Before installing the gate operator, make sure the gate’s swing
is free and level throughout the entire swing path. If the gate
does not seem to operate properly, it may affect the operator
performance or greatly shorten the life of the unit. The gate
should be designed so that airflow is ample to prevent wind
resistance and drag.
LIMITED TWO-YEAR WARRANTY
This electric operator is warranted for a period of two (2)
years from date of sale against defects in materials or
workmanship. Defective part(s) shall be repaired or re-
placed at no charge, at the manufacturer’s option. All
accessories are covered by their manufacturer’s warranty.
The manufacturer will not be responsible for trans-
portation and/or field service charges.
The above warranty is in lieu of all other warranties, ex-
pressed or implied, and shall be considered void if visible
evidence implies recommended installation procedures
and maintenance instructions were not followed, or if the
electric operator was not sized appropriately for the par-
ticular installation.
The following contact or non-contact obstruction de-
tection devices have been approved for use with
OSCO swing gate operators as part of a UL325 com-
pliant installation:
2510-264
EMX Model IRB-325 photoeye 60’ with
mounting hardware
2520-031
MMTC Model E3K photoeye, 28’ with
mounting hardware
Содержание MSG-A
Страница 16: ...MSG A MSG D OPERATOR INSTALLATION GUIDE 16 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...
Страница 17: ...MSG A MSG D OPERATOR INSTALLATION GUIDE 17 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...
Страница 18: ...MSG A MSG D OPERATOR INSTALLATION GUIDE 18 OSCO CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...
Страница 24: ...MSG A MSG D OPERATOR INSTALLATION GUIDE 24 MODEL MSG AMECHANICAL PARTS EXPLODED VIEW 5 03 14...
Страница 28: ...MSG A MSG D OPERATOR INSTALLATION GUIDE 28 MODEL MSG DMECHANICAL PARTS EXPLODED VIEW 5 03 14...
Страница 34: ...MSG A MSG D OPERATOR INSTALLATION GUIDE 34 8 03 15...