- 4 -
FIGURE 2
PATIO HEATER ASSEMBLY
ASSEMBLY INSTRUCTIONS
z
List of Required Tools:
Philip Screwdriver / Adjustable Spanners / Wrenches
z
Leak Detection Solution one part detergent and three parts
water
z
Assemble all nuts and bolts loosely at first. Tighten all
connections after completion of assembly. This eases your
work and increases the stability of your appliance.
z
Before assembly, make sure all packing material and any
transmit protection must be moved.
z
Small deviations in equipment may occur. This is no lack of
quality but subject to improvements.
ASSEMBLY
SETP 1:
Screw rear panel of housing to the base with 5pcs bolts
M5 x 12 and 5pcs washers. (Detail Abb. A)
Note:
Start with two bolts at both ends of rear panel of
housing, then three bolts in the middle, which will ease the
assembly.
SETP 2:
Place the housing lid onto rear panel of housing. Screw
together the housing lid and rear panel of housing with
5pcs bolts M5 x 12 and 5pcs washers. (Detail Abb. B)
SETP 3:
Fix the post onto the housing lid with 4pcs bolts M5 x 12
and 4pcs washers. Then put the plastic cover over the
screws and bolts through the post. (Detail Abb. C)
SETP 4:
Place the reflector to main burner using 3pcs round cap
nuts and 3pcs big washers. (Detail Abb. D)
SETP 5:
Tighten inner gas pipe to main burner (See Figure 2),
Note:
please examine the tightness before use. If
damages are evident, they must be eliminated
immediately. (See Leakage Test)
Then fix main burner to the post with 3 bolts M5 x 12 and
3pcs washers. (Detail Abb. E)
SETP 6:
Fix the door to rear panel of housing. (See Figure 1 and
Detail Abb. F)
18