background image

Installation Manual:

 

AdvanTex

®

 AX20-RT Treatment Units

NIM-ATX-AXRT-1

Rev. 1.0, 1/10

© 2010 Orenco Systems

®

 Inc.

8

Step 6:  Prep and Install Counterbuoyancy

Because of the shallow burial depth of the AX20-RT, you may 

need to install counterbuoyancy measures on the unit, especially 

if the site has seasonally high groundwater. If you are unsure 

whether or not your installation requires counterbuoyancy mea-

sures, contact your Dealer or Orenco.

There are two types of counterbuoyancy offered by Orenco, fac-

tory counterbuoyancy flange kits or counterbuoyancy tie-down 

hardware kits. 

6a) Counterbuoyancy Flanges:

 

1: 

Using properly-sized lifting equipment, Raise the AX20-RT 

unit 3-4 in. (75-100 mm) off of a flat, level surface.

2: 

Lightly sand the contact surfaces on the upper surfaces of the 

flanges and the bottom of the AX20-RT, and then clean the sand-

ed surfaces with acetone and clean, dry, lint-free rags. 

3.

 Apply a ¾-in. (19-mm) bead of SS115 or SS140 adhesive 

down the length of each flange. 

4. 

Slide the flanges under the AX20-RT unit, and then lower the 

unit onto the flanges. Allow the adhesive to set before moving 

the AX20-RT. 

6b) Counterbuoyancy Tie-Downs:

 

Orenco’s tie-down counterbuoyancy hardware kits are for use 

with concrete forms. Sections of 12-in. diameter PVC half-pipe 

or chamber material can be used as forms; simple forms 12 in. 

wide × 6 in. high × 4 ft long (305 mm × 152 mm × 1.22 m) can 

be built from wood. 

NOTE: 

To save time, we recommend preparing the counter-

buoyancy measures offsite before you install the unit.

1: Fill 

the forms halfway with concrete, and then place two #4 

reinforcing bars in each of the forms.

2: Finish 

filling the forms with concrete.

NOTE: 

Wait for the concrete to set completely before lifting 

the counterbuoyancy measures.

3: Use 

appropriate lifting equipment to set the pieces in place.

4: Secure 

the pieces to the unit with the supplied cables and 

hardware.

Counterbuoyancy tie-down cables and half-pipe con-

crete forms

Two #4  

rebar

Cable

12 in.  

(305 mm)

6b

6 in. 

(152 mm)

4 ft  

(1.22 m)

Содержание AdvanTex AX20-RT

Страница 1: ...AdvanTex AX20 RT Treatment Systems An illustrated guide to installing an Orenco AdvanTex AX20 RT Treatment System 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco Systems Incorporated...

Страница 2: ...ew before shipping If this system or any of its components possesses flaws that would inhibit its proper func tioning please contact your authorized AdvanTex Dealer The Dealer can also provide repair...

Страница 3: ...sting primary tank must have an at grade access with a securable and removable lid If it doesn t an at grade access must be installed onto the primary tank and be made watertight The primary tank must...

Страница 4: ...ayer passes through a Biotube effluent filter and is discharged by gravity to the recirculating treatment tank portion of the AX20 RT unit which contains a Biotube Pump Package The Biotube Pump Packag...

Страница 5: ...ans or with plans of limited detail contact your local Dealer or Orenco for design assistance Determine and sketch the exact positions of the primary tank and AX20 RT unit on the site Account for curr...

Страница 6: ...emember that you need the correct depth for a consistent slope of 1 8 in per foot 10 mm per meter or 1 from the septic tank outlet to the inlet of the AX20 RT Step 2c Make sure the bottom of the excav...

Страница 7: ...m into the riser because structural damage to the tank may occur The inlet and outlet pipe into the tank needs to be turned up or plugged to allow the tank to be filled CAUTION Check the tank manufact...

Страница 8: ...the unit is excavated and after a com pacted bed of aggregate or pea gravel if necessary is laid Step 5c Make sure the bottom of the excavation is stable and free of debris especially rocks and other...

Страница 9: ...Apply a in 19 mm bead of SS115 or SS140 adhesive down the length of each flange 4 Slide the flanges under the AX20 RT unit and then lower the unit onto the flanges Allow the adhesive to set before mo...

Страница 10: ...ill to minimize settlement and provide sup port for the walls of the unit Step 7c After the first layer of backfill is complete fill the tank with water to just above the midseam flange on both sides...

Страница 11: ...AX20 RT unit Be sure the vent line is sloped to drain towards the unit and that the passive air vent is within 20 ft 6 m of the unit After installation the top of the passive air vent should be a mini...

Страница 12: ...nclude the following items a Incoming power to the panel One or more circuits may be required depending upon the number of pumps and local electrical codes b Incoming phone line to the panel for VeriC...

Страница 13: ...isabled Local audible and visual alarms are activated as alarm conditions occur System Data Logs are suspended and Timer cycles are shortened Step 10f Familiarize yourself with the floats on the syste...

Страница 14: ...Comm Monitoring System A red LED Modem Activity component should illuminate indicat ing that the controller has established communication with the host This may take a few minutes Once the communicati...

Страница 15: ...desired squirt height is not achieved or the unit does not pressurize check for debris breaks or closed valves Also verify that the pump is receiving sufficient power If the unit still does not pressu...

Страница 16: ...non cohesive soils with high seasonal water tables use in crushed rock as the backfill material The top of the AX20 RT lid should sit 2 in 50 mm above final grade IMPORTANT After backfilling call the...

Страница 17: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc 16 Notes 17...

Страница 18: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc Notes 17...

Страница 19: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc Notes 18...

Страница 20: ...ystems Residential Applications 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco Systems Incorporated Changing theWay the World DoesWastewater N S F ANSI STANDARD 4 0 NSF AdvanTex Trea...

Отзывы: