background image

Installation Manual:

 

AdvanTex

®

 AX20-RT Treatment Units

NIM-ATX-AXRT-1

Rev. 1.0, 1/10

© 2010 Orenco Systems

®

 Inc.

12

10f

Top float:  

High water alarm

Float tether

Middle float:  

Override timer

Bottom float: 

Low water alarm/ 

redundant off

VeriComm

®

 Recirculating Float Assembly shown

Step 10d: 

Make sure the panel has been completely and cor-

rectly installed, and verify that the circuit breakers are in the 

“On” position. Also check the controller status. The power LED, 

located on the control board, will be:

•  Blinking, which indicates the controller is operating normally, or
•  Off (when power is applied), which indicates a possible problem with 

  ~  the input fuse on the PC board; 

~  the main fuse located inside the panel; 

~  the controls circuit breaker located inside the panel; or 

~  the incoming line voltage. 

Step 10e: 

To enable Test Mode, hold the “Push-To-Silence”  

button on the front of the panel until the audible alarm sounds 

(approximately 15 seconds).

•  The appropriate digital input should be illuminated when the button 

 

  is held in. 

•  When the audible alarm sounds to indicate that the panel is in Test

 

  Mode, release the button.

While in Test Mode, the panel will operate in the following  

manner:

•  The call-in function is disabled;

 

•  Local audible and visual alarms are activated as alarm conditions 

 

  occur; 

•  System Data Logs are suspended; and

 

•  Timer cycles are shortened. 

Step 10f: 

Familiarize yourself with the floats on the system. 

Step 10g: 

Verify that the pump is submerged in water before 

continuing. If the bottom float drops, the alarm should sound. 

Press down the spring-loaded “AUTO/OFF/MAN” switch locat-

ed inside the panel. The pump should immediately activate. For 

verification, the appropriate digital input should illuminate, indi-

cating that the auxiliary contact is on.
Measure the voltage and amperage of the pump.

a) Measure the voltage at the pump terminals in the panel. Measuring 

the voltage with the pump off will confirm that the correct voltage is 

connected. Then activate the pump by toggling the AUTO/OFF/MAN 

switch to MAN, or using a PDA or laptop with the Bluetooth Device, 

and measure the voltage while the pump is running. The maximum 

recommended voltage drop is 3%. A low voltage condition may indi-

cate that the site wiring is improperly sized. 

b) Using a loop ammeter, place the ammeter clamp around the loop of 

wire located above the pump circuit breaker and read the amperage 

while the pump is running and connected to the discharge assem-

bly with the valves at the end of the laterals closed. The amperage 

should be within the specifications of the pump.

10g

Measure voltage 

10g

Measure amperage

Содержание AdvanTex AX20-RT

Страница 1: ...AdvanTex AX20 RT Treatment Systems An illustrated guide to installing an Orenco AdvanTex AX20 RT Treatment System 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco Systems Incorporated...

Страница 2: ...ew before shipping If this system or any of its components possesses flaws that would inhibit its proper func tioning please contact your authorized AdvanTex Dealer The Dealer can also provide repair...

Страница 3: ...sting primary tank must have an at grade access with a securable and removable lid If it doesn t an at grade access must be installed onto the primary tank and be made watertight The primary tank must...

Страница 4: ...ayer passes through a Biotube effluent filter and is discharged by gravity to the recirculating treatment tank portion of the AX20 RT unit which contains a Biotube Pump Package The Biotube Pump Packag...

Страница 5: ...ans or with plans of limited detail contact your local Dealer or Orenco for design assistance Determine and sketch the exact positions of the primary tank and AX20 RT unit on the site Account for curr...

Страница 6: ...emember that you need the correct depth for a consistent slope of 1 8 in per foot 10 mm per meter or 1 from the septic tank outlet to the inlet of the AX20 RT Step 2c Make sure the bottom of the excav...

Страница 7: ...m into the riser because structural damage to the tank may occur The inlet and outlet pipe into the tank needs to be turned up or plugged to allow the tank to be filled CAUTION Check the tank manufact...

Страница 8: ...the unit is excavated and after a com pacted bed of aggregate or pea gravel if necessary is laid Step 5c Make sure the bottom of the excavation is stable and free of debris especially rocks and other...

Страница 9: ...Apply a in 19 mm bead of SS115 or SS140 adhesive down the length of each flange 4 Slide the flanges under the AX20 RT unit and then lower the unit onto the flanges Allow the adhesive to set before mo...

Страница 10: ...ill to minimize settlement and provide sup port for the walls of the unit Step 7c After the first layer of backfill is complete fill the tank with water to just above the midseam flange on both sides...

Страница 11: ...AX20 RT unit Be sure the vent line is sloped to drain towards the unit and that the passive air vent is within 20 ft 6 m of the unit After installation the top of the passive air vent should be a mini...

Страница 12: ...nclude the following items a Incoming power to the panel One or more circuits may be required depending upon the number of pumps and local electrical codes b Incoming phone line to the panel for VeriC...

Страница 13: ...isabled Local audible and visual alarms are activated as alarm conditions occur System Data Logs are suspended and Timer cycles are shortened Step 10f Familiarize yourself with the floats on the syste...

Страница 14: ...Comm Monitoring System A red LED Modem Activity component should illuminate indicat ing that the controller has established communication with the host This may take a few minutes Once the communicati...

Страница 15: ...desired squirt height is not achieved or the unit does not pressurize check for debris breaks or closed valves Also verify that the pump is receiving sufficient power If the unit still does not pressu...

Страница 16: ...non cohesive soils with high seasonal water tables use in crushed rock as the backfill material The top of the AX20 RT lid should sit 2 in 50 mm above final grade IMPORTANT After backfilling call the...

Страница 17: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc 16 Notes 17...

Страница 18: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc Notes 17...

Страница 19: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc Notes 18...

Страница 20: ...ystems Residential Applications 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco Systems Incorporated Changing theWay the World DoesWastewater N S F ANSI STANDARD 4 0 NSF AdvanTex Trea...

Отзывы: