Site Preparation Guide
Chapter 6
Vacuum Pump
The vacuum pump is provided by Orbotech with the system. All
preparations required for installation, and the installation itself, are the
responsibility of the customer. The vacuum pump should be installed in an
isolated environment due to its noise level (86 dB (A)).
Smooth plastic water installation piping is recommended.
Vacuum line lengths are specified in
Pipe routing should enable access to all connection points for maintenance
in case of leakage.
.
Note
Important: ensure this separate room is ventilated!
Table 6.1 Vacuum Line Lengths
Hose/Line
Max Length
Diameter
Pump to DP-100SL vacuum line
40 m (132 ft.)
4 in
(Smooth plastic water installation piping;
customer supplied)
30 m (98 ft.)
20 m (66 ft.)
3 in (internal)
3 in (internal)
Orbotech standard
15 m (49 ft.)
2.5 in
Содержание DP-100SL
Страница 1: ...DP 100SL Site Preparation Guide October 2003 Revision A ...
Страница 2: ......
Страница 14: ......
Страница 18: ......
Страница 25: ...DP 100SL 19 Site Preparation Guide Figure 3 2 System Dimensions Front View ...
Страница 26: ...20 Chapter 3 Facility Physical Requirements Figure 3 3 System Dimensions Side View ...
Страница 27: ...DP 100SL 21 Site Preparation Guide Figure 3 4 Site Dimensions Standard Configuration ...
Страница 32: ......
Страница 40: ......
Страница 48: ......