30
Chapter 5
Electricity
Electrical Protection
An automatic, slow-blow 3-phases circuit breaker (*) should be installed in
series to the power line.
Power Connectors
The electrical supply must have a lockable main switch
. The
customer is responsible for providing this switch, as well as circuit
breakers and receptacles according to prevailing local standards.
The customer must provide a power outlet for the servicing, which will be
connected to the same power line as the machine.
Note
(*) Release characteristic C in compliance with EN 60898 standard.
Table 5.5 Requirements for the circuit breaker
Unit
400 V
(Europe)
480 V
(USA)
200 V
(Japan)
Machine
16 A
16 A
32A
Pump
16A
16A
16A
Содержание DP-100SL
Страница 1: ...DP 100SL Site Preparation Guide October 2003 Revision A ...
Страница 2: ......
Страница 14: ......
Страница 18: ......
Страница 25: ...DP 100SL 19 Site Preparation Guide Figure 3 2 System Dimensions Front View ...
Страница 26: ...20 Chapter 3 Facility Physical Requirements Figure 3 3 System Dimensions Side View ...
Страница 27: ...DP 100SL 21 Site Preparation Guide Figure 3 4 Site Dimensions Standard Configuration ...
Страница 32: ......
Страница 40: ......
Страница 48: ......