Assembling and Installing DC Power Cables for the Sun SPARC Enterprise T5140 Server
91
FIGURE:
Assembling the Strain Relief Housing
Related Information
■
“Connect the DC Input Power Cords to the Server” on page 91
▼
Connect the DC Input Power Cords to the Server
1. Ensure that the circuit breaker to your power source is turned off.
Caution –
Do not proceed with these instructions until you have turned off the
power from the DC power source through the circuit breakers.
2. Route the power cables in the rack and secure the cables with nylon tie wraps.
3. Connect the chassis ground wire to the facility earth ground and ensure that
this connection has proper bonding.
Содержание T5140
Страница 11: ...xiii Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Страница 51: ...40 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Страница 91: ...80 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Страница 111: ...100 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Страница 115: ...104 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...