
Servicing Power Supplies
43
Inspecting a Power Supply
Before installing a power supply, perform these tasks to verify its suitability for
installation.
Related Information
■
“Inspecting a Fan” on page 57
■
“Inspecting the Data Cables” on page 65
▼
Identify the Power Supply
1. Identify the prerequisite and subsequent service tasks you must perform in
conjunction with this procedure.
See
“Inspecting a Power Supply” on page 43
.
2. Use this illustration to identify the various features of a power supply.
Step
Description
Links
1.
Identify the Power Supply.
“Identify the Power Supply” on page 43
2.
Inspect the hardware.
“Inspect the Power Supply Hardware” on
page 45
3.
Inspect the connectors.
“Inspect the Power Supply Connectors” on
page 45
Содержание Sun Network QDR InfiniBand Gateway Switch
Страница 48: ...40 Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2 1 March 2013 ...
Страница 62: ...54 Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2 1 March 2013 ...
Страница 72: ...64 Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2 1 March 2013 ...